9-1-6: FIRE SPRINKLER TRIGGER POINTS:
   FIRE SPRINKLER TRIGGER POINTS FOR REQUIRED INSTALLATIONS
   ON NEW CONSTRUCTION OR CHANGE OF USE
Occupancy
Trigger Points For Required Installations (New Construction Or Change Of Use)
Occupancy
Trigger Points For Required Installations (New Construction Or Change Of Use)
A-1, theaters
All
A-2, restaurants
All
A-3, other assembly, worship
>3,000 square feet
A-4, arenas, rinks
>3,000 square feet
A-5, outdoor assembly
>3,000 square feet
B, business
>3,000 square feet
E, education
All
F-1, low hazard factory
>3,000 square feet
F-2, moderate hazard factory
>3,000 square feet
H-1, explosives
All
H-2, flammable liquids - open
All
H-3, flammable liquids - stored
All
H-4, toxic and corrosive materials
All
H-5, semiconductor fabrication
All
I-1, assisted living
All
I-2, hospitals, nursing
All
I-3, jails
All
I-4, daycare
All
M, mercantile
>3,000 square feet
R-1, hotels
>3,000 square feet
R-2, apartments
All
R-3, other residential
All
R-4 other residential <16
All
S-1, low hazard storage
>3,000 square feet
S-2, moderate hazard storage
>3,000 square feet
Utility
No requirement
Single-family
No requirement
 
(2013 Code § 11-1-19)