3-3-1: BUILDING AND RELATED ACTIVITIES:
Fees shall be charged as hereinafter set forth for review of building permit applications by the Building and Zoning Officer for compliance with the Village zoning ordinance, for the review of applications for permits and for the issuance of permits, with such fees to be paid by the applicant at the time of filing of the application for such review with the Building and Zoning Officer, except for the portion of the building permit fee determined after plan review is complete:
Access permits:
 
Access permits:
 
 
Driveway access permit fee
$1,450.00
 
Temporary access permit valid for 180 days
150.00
Accessory structures:
 
 
$200.00 plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village
Addition to residence
$200.00 minimum plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1
Cellular towers including associated equipment structures:
 
 
Modification of existing towers/monopole
$1,200.00 fee
 
New towers
$25.00 per each foot of tower height
Decks and concrete/asphalt/pavers driveways, patios, and public or private walks
$200.00 plan review fee, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $200.00 or 140% of the cost to the Village, whichever is greater1
Demolition:
 
 
Commercial structure
$200.00 fee
 
Residential structure:
 
 
 
Complete demolition
150.00 fee
 
 
Interior demolition only
100.00 fee
 
All other structures
$100.00 fee, except sheds under 200 sq. ft., no charge
Establishment of use (business/commercial uses)
$125.00 fee
Fences
85.00 fee
Inspections:
 
 
All inspections not listed
55.00 fee
 
Reinspections: Inspections that fail require a reinspection fee; the fee must be paid prior to the reinspection:
 
 
 
First reinspection
75.00 fee
 
 
Second reinspection
100.00 fee
Moving a structure
300.00 fee
New construction:
 
 
New commercial buildings
$10,000.00 permit administration fee.
 
New single-family homes
$10,000.00 permit administration fee.
New parking lot
$200.00 plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1
Permit extension
$50.00 fee
Remodeling or build-out:
 
Commercial
$200.00 minimum plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1
 
Residential
$200.00 minimum plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1
Right-of-way permit
Total fee shall be $150.00 or 140% of the cost to the Village, whichever is greater1
Signs:
 
 
All signs greater than 3 sq. ft., except temporary/promotional signs
$100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1
 
Political signs
No charge
 
Religious and other nonprofit organization signs
No charge
 
Temporary/promotional signs
$20.00 fee
Stormwater permit
Based on Village Stormwater Engineer's fees. Total fee shall be 140% of the cost to the Village1
Swimming pools, spas and hot tubs:
 
Aboveground pools, spas and hot tubs (excludes temporary, plastic kiddie pools)
$200.00 minimum plan review fee/deposit, plus remaining costs determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1
 
In ground pools
$200.00 minimum plan review fee/deposit, plus remaining costs determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1
 
Temporary aboveground pools less than 24 inches deep
No permit required
Work started without a permit or necessary zoning approval
A penalty of 100% of the permit fee. This fee may be waived by the Village Administrator for such cases not involving wilful and wanton conduct
Miscellaneous building permits:
 
 
Installation and/or replacement of:
 
 
 
Air conditioning and/or furnace units
$100.00 fee
 
 
Electric service/panel upgrade
$100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1
 
 
Gas line/fire pits - new fee
$100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1
 
 
Irrigation system
$100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1
 
 
Reroofing
$135.00 fee
 
 
Siding, gutters, window replacement, exterior door replacement, other minor alterations: Determined based on the estimated project cost:
 
 
 
 
For the first $1,000.00 of project cost
50.00
 
 
 
For each additional $1,000.00 of project cost
12.00
 
 
Generators
$215.00 fee (includes a plan review)
 
 
Solar panels
$375.00 minimum plan review fee/deposit, plus remaining costs determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1
 
Note:
   1.    When a fee is established at 140% of the Village's costs, that fee is based on 100% of the costs actually incurred by the Village in retaining outside consultants, plus an additional 40% of that cost to cover the Village's in-house administrative costs.
(Ord. O-18-20, 10-16-2018; amd. Ord. O-19-09, 5-21-2019; Ord. O-23-19, - -2023)