Fees shall be charged as hereinafter set forth for review of building permit applications by the Building and Zoning Officer for compliance with the Village zoning ordinance, for the review of applications for permits and for the issuance of permits, with such fees to be paid by the applicant at the time of filing of the application for such review with the Building and Zoning Officer, except for the portion of the building permit fee determined after plan review is complete:
Access permits: |
Access permits: | ||||
Driveway access permit fee | $1,450.00 | |||
Temporary access permit valid for 180 days | 150.00 | |||
Accessory structures: | ||||
$200.00 plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village
| ||||
Addition to residence | $200.00 minimum plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1 | |||
Cellular towers including associated equipment structures: | ||||
Modification of existing towers/monopole | $1,200.00 fee | |||
New towers | $25.00 per each foot of tower height | |||
Decks and concrete/asphalt/pavers driveways, patios, and public or private walks | $200.00 plan review fee, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $200.00 or 140% of the cost to the Village, whichever is greater1 | |||
Demolition: | ||||
Commercial structure | $200.00 fee | |||
Residential structure: | ||||
Complete demolition | 150.00 fee | |||
Interior demolition only | 100.00 fee | |||
All other structures | $100.00 fee, except sheds under 200 sq. ft., no charge | |||
Establishment of use (business/commercial uses) | $125.00 fee | |||
Fences | 85.00 fee | |||
Inspections: | ||||
All inspections not listed | 55.00 fee | |||
Reinspections: Inspections that fail require a reinspection fee; the fee must be paid prior to the reinspection: | ||||
First reinspection | 75.00 fee | |||
Second reinspection | 100.00 fee | |||
Moving a structure | 300.00 fee | |||
New construction: | ||||
New commercial buildings | $10,000.00 permit administration fee. | |||
New single-family homes | $10,000.00 permit administration fee. | |||
New parking lot | $200.00 plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1 | |||
Permit extension | $50.00 fee | |||
Remodeling or build-out: | ||||
Commercial | $200.00 minimum plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1 | |||
Residential | $200.00 minimum plan review fee/deposit, plus remaining fee, determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1 | |||
Right-of-way permit | Total fee shall be $150.00 or 140% of the cost to the Village, whichever is greater1 | |||
Signs: | ||||
All signs greater than 3 sq. ft., except temporary/promotional signs | $100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1 | |||
Political signs | No charge | |||
Religious and other nonprofit organization signs | No charge | |||
Temporary/promotional signs | $20.00 fee | |||
Stormwater permit | Based on Village Stormwater Engineer's fees. Total fee shall be 140% of the cost to the Village1 | |||
Swimming pools, spas and hot tubs: | ||||
Aboveground pools, spas and hot tubs (excludes temporary, plastic kiddie pools) | $200.00 minimum plan review fee/deposit, plus remaining costs determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1 | |||
In ground pools | $200.00 minimum plan review fee/deposit, plus remaining costs determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1 | |||
Temporary aboveground pools less than 24 inches deep | No permit required | |||
Work started without a permit or necessary zoning approval | A penalty of 100% of the permit fee. This fee may be waived by the Village Administrator for such cases not involving wilful and wanton conduct | |||
Miscellaneous building permits: | ||||
Installation and/or replacement of: | ||||
Air conditioning and/or furnace units | $100.00 fee | |||
Electric service/panel upgrade | $100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1 | |||
Gas line/fire pits - new fee | $100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1 | |||
Irrigation system | $100.00 plan review fee/deposit, plus remaining costs, determined when the plan review is complete based upon Village costs. Total fee shall be $100.00 or 140% of the cost to the Village, whichever is greater1 | |||
Reroofing | $135.00 fee | |||
Siding, gutters, window replacement, exterior door replacement, other minor alterations: Determined based on the estimated project cost: | ||||
For the first $1,000.00 of project cost | 50.00 | |||
For each additional $1,000.00 of project cost | 12.00 | |||
Generators | $215.00 fee (includes a plan review) | |||
Solar panels | $375.00 minimum plan review fee/deposit, plus remaining costs determined when the plan review is complete based upon Village costs. Total fee shall be 140% of the cost to the Village1 | |||
Note:
1. When a fee is established at 140% of the Village's costs, that fee is based on 100% of the costs actually incurred by the Village in retaining outside consultants, plus an additional 40% of that cost to cover the Village's in-house administrative costs.
(Ord. O-18-20, 10-16-2018; amd. Ord. O-19-09, 5-21-2019; Ord. O-23-19, - -2023)