§ 54.061  POST-CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN REQUIREMENTS.
   Applications for level 3 site development permits shall include a post-construction stormwater pollution prevention plan (P-SWPPP) to be completed, sealed, and signed by a licensed professional engineer and submitted to the MS4 representative or their designee. Applications for level 2 site development permits may be required to submit a P-SWPPP at the discretion of the MS4 representative or their designee. The P-SWPPP shall include the following:
   (A)   A description of the proposed land use including amount of additional impervious area to be developed, directly connected impervious area, and nature of the development;
   (B)   Location, dimensions, detailed specifications, including waterway buffers where appropriate, and construction details of all post-construction stormwater quality BMPs as defined in the city guidance documents;
   (C)   A sequence describing when each post-construction stormwater quality BMP will be installed; and
   (D)   A long-term operation and maintenance agreement containing maintenance guidelines for all post-construction stormwater quality measures to facilitate their proper long-term function. This agreement shall be recorded as a restricted covenant on the property and thereby made available to future parties, including property owners, who will assume responsibility for the operation and maintenance of post-construction stormwater quality measures. See requirements in § 54.066 of this chapter.
(Ord. 14-08, passed 9-3-2014)  Penalty, see § 54.999