§ 54.024  PROTECTION REQUIREMENTS FOR WATERWAYS AND PUBLIC STORM DRAINS.
   Waterway, watercourse, ephemeral stream, and public storm drain protection requirements shall include the following:
   (A)   If a watercourse will be crossed regularly during construction, a temporary stream crossing shall be installed as approved by the KYDOW and the MS4 representative or their designee;
   (B)   Stabilization of the watercourse channel shall be made before, during, and after any in-channel work; and
   (C)   Stabilization shall be made to adequately prevent erosion at the inlets and outlets of all pipes and paved channels.
(Ord. 14-08, passed 9-3-2014)  Penalty, see § 54.999