(a) Minimum Requirements. The minimum improvements which the subdivider shall petition for or enter into agreement to provide for, shall be as prescribed by the foregoing provisions. All of these improvements shall be completed in full compliance with specifications for each of the various units as required or as designed by the City Engineer.
(b) By Petition. All improvements, including street construction (curbs, pavement and gutters), sewer and water line extensions, storm sewer construction and sidewalks (if required) shall ordinarily be petitioned for by the subdivider and shall be constructed in accordance with the plans and specifications as prepared by the City Engineer.
(c) Exception. In cases where the subdivider plans to extend improvements, he must have completed the following:
(1) Construction drawings for all improvements agreed upon or required by the Planning Commission must be in compliance with the standards and specifications of the City Engineer and approval and certification indicated on such drawings.
(2) A performance bond shall be placed on file with the Planning Commission equal to the total cost of completion of all the improvements as agreed upon or required by the Planning Commission.
(3) A fixed fee shall be placed on file with the auditor, covering the entire cost of inspection by the City Engineer or his representative or any other municipal authority having jurisdiction over local streets or publicly owned utilities to insure proper construction.
(Ord. 62-5165. Passed 4-24-62.)