Construction, installation, operation and maintenance of the system shall be performed in an orderly and workmanlike manner, in accordance with then current technological standards. All cables and wires shall be installed, where possible, parallel with electric and telephone lines. Multiple cable configurations shall be arranged in parallel and bundled with due respect for engineering considerations.
(Ord. passed 10-19-98)