(A) The size, slope, alignment, materials and construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the village.
(B) Sewage facilities shall also conform to the Water Pollution Control Federation Manual of Practice No. 9 - Design and Construction of Sanitary and Storm Sewers and 10 - States Standards.
(Ord. 130, passed 5-19-1992)