(A) The Village Engineer shall be responsible for fulfilling all of the duties listed in § 151.04.
(B) To fulfill those duties, the Village Engineer should first use the criteria listed in § 151.05, base flood elevations, to determine whether the development site is located within a floodplain.
(C) Once it has been determined that a site is located within a floodplain, the must determine whether the development site is within a flood fringe, a designated floodway, or within a SFHA or floodplain for which no floodway has been identified.
(1) If the site is within a flood fringe, the Village Engineer shall require that the minimum requirements of § 151.06 be met.
(2) If the site is within a floodway, the Village Engineer shall require that the minimum requirements of § 151.07 be met.
(3) If the site is located within a SFHA or floodplain for which no detailed study has been completed and approved, the Village Engineer shall require that the minimum requirements of § 151.08 be met.
(E) The Village Engineer shall assure that all subdivision proposals shall meet the requirements of § 151.10.
(F) If a variance is to be granted for a proposal, the Village Engineer shall review the requirements of § 151.11 to make sure they are met. In addition, the Village Engineer shall complete all notification requirements.
(G) In order to assure that property owners obtain permits as required in this chapter, the Village Engineer may take any and all actions as outlined in § 151.99.
(Ord. 08-960, passed 7-10-2008)