§ 153.40 SPECIAL FLOOD HAZARD AREA STANDARDS GENERALLY.
   In all areas of special flood hazard, the following provisions are required for all new construction and substantial improvements.
   (A)   All new construction or substantial improvements shall be designed or modified and adequately anchored so as to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy.
   (B)   All new construction or substantial improvements shall be constructed by methods and practices which minimize flood damage.
   (C)   All new construction or substantial improvements shall be constructed with materials resistant to flood damage.
   (D)   All new construction or substantial improvements shall be constructed with electrical, heating, ventilation, plumbing, air conditioning equipment and other service facilities which are designed or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
   (E)   All new and replacement water supply systems shall be designed so as to minimize or eliminate the infiltration of floodwaters into the system.
   (F)   New and replacement sanitary sewage systems shall be designed so as to minimize or eliminate the infiltration of floodwaters into the system and discharge from the system into floodwaters.
   (G)   On-site waste disposal systems shall be located so as to avoid impairment to them or contamination from them during flooding.
(Prior Code, § 12-216) (Ord. 2010-07, passed 1-11-2011) Penalty, see § 153.99