(A) A re-inspection fee, set by the City Council annual fee resolution, may be assessed for each inspection or a re-inspection when such portion of work for which inspection is required is not complete or when required corrections are not made. The decision to impose a re-inspection fee will be based upon the criteria found in division (B).
(B) The following criteria will be considered in determining whether to impose a re-inspection fee:
(1) Whether an inspection has been scheduled, is not cancelled and the work to be inspected is clearly not ready for inspection;
(2) Whether, for new house framing inspections, certified truss specifications are not present on the job for the inspection;
(3) Whether owner/builders require several partial inspections when a professional contractor would normally require a single inspection; or
(4) Whether the circumstances indicate the inspection was scheduled not because the work would be ready for inspection, but because of a desire to avoid a time delay in obtaining the required inspection.
(Ord. 03-08, passed 11-26-03; Am. Ord. 21-03, passed 5-12-21)