At the time the permit is granted, the city requires as a condition of issuance that the applicant post a cash deposit with the city to cover the estimated costs to be incurred by the city as a result of the building’s move. Those costs may include the estimated costs of labor, overhead, and materials, which will be expended by the city to facilitate the temporary removal and replacement, relocation, or damage to, or destruction of, public property or facilities, occasioned by the building’s move.
(Ord. 04-02, passed 6-23-04)