Any person permitted to install a private well and desiring discharge of wastewater into the city’s wastewater system, must meet the following requirements.
(A) Submit an application, in writing, on the form provided by the Utility, requesting authorization from the Board to connect to the wastewater system. The written request must identify the point of desired connection, the size of the pipe and the pipe materials, the type of connection, the type of wastewater and the estimated volume of the discharge to the wastewater system.
(B) After receipt of written authorization from the Board, the applicant shall install a metering device, approved by the Superintendent as to the make and model, prior to connecting to the City’s wastewater system. The meter shall be purchased and installed by the property owner.
(C) Certification from a laboratory or licensed professional engineer that the wastewater to be discharged is not specifically prohibited as identified in § 52.011(B) of the City Code of Ordinances.
(Ord. 1627, passed 7-5-16)