(A) In addition to the provisions in § 52.060, any user who violates the following conditions is subject to termination of the right to discharge to the Butler POTW.
(1) Violation of wastewater discharge permit conditions;
(2) Failure to accurately report the wastewater constituents and characteristics of its discharge;
(3) Failure to report significant changes in operations, wastewater volume, constituents, and/or characteristics prior to discharge;
(4) Refusal of reasonable access to the user’s premises for the purpose of inspection, monitoring, or sampling; or
(5) Violation of the pretreatment standards contained in this chapter.
(B) The user will be notified of the proposed termination of its discharge, in writing, and be provided two calendar days to show cause why the proposed action should not be taken. The issuance of a proposed termination notice by the Superintendent shall not be a bar to, or a prerequisite for, taking any other action against the user.
(Ord. 1476, passed 6-18-07; Am. Ord. 1639, passed 12-19-16) Penalty, see § 52.999