1347.05 FINAL PLOT PLAN.
   Upon completion of the improvements, each applicant shall file with the Village Engineer a Final Plot Plan, which plan shall show the final grades of the improvement as constructed. Such plan shall be certified by a registered engineer or registered surveyor as to the accuracy of the plan, depicting the actual construction, and as to whether or not such engineer or surveyor has made an actual filed observation of as-built conditions and that these conditions are as shown on the plan. The form of such certification shall be prescribed by the Village Engineer and shall contain the following information:
   (a)    Sufficient point elevations to assure that planned swales and drainage courses have been constructed;
   (b)    Sufficient point elevations to ensure that all drainage is positive and sloping away from dwelling;
   (c)    Provide sideline and set-back “as-built” dimensions;
   (d)    Provide garage, patio and finished first floor elevations;
   (e)    Provide "as-built" dimensions around perimeter of building;
    (f)    Provide finished found grades at major building corners.
      (Ord. 1912-97. Passed 8-18-97.)