8-7-5-4: USE OF BUILDING SEWERS:
   (A)   A separate and independent building sewer shall be provided for every building; except:
      1.   Where one building is located at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer; or
      2.   Where access to the public sewer would otherwise require cutting a paved public city road and the City has denied the request to cut the pavement due to the paved road surface being less than three (3) years old, and boring beneath the road would also result in damage to the paved road surface when connecting to the existing sewer main and no private sewer is available or can be constructed, the building sewer may be connected to an existing building sewer provided all requirements of the Idaho State Plumbing Code (including but not limited to Section 721.2) are satisfied.
   (B)   Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the Director of Wastewater Services, to meet all requirements of this chapter. (Ord. 1357, 3-19-2019; amd. Ord. 1372, 4-7-2020)