(A) Prerequisites to final approval. The subdivider is required to install or construct the improvements hereinafter described prior to receiving approval of his final plat or prior to having released the bonds or other securities which guarantee such required improvements.
(Prior Code, § 16-10-31)
(B) Water mains and sewers. All public and private water mains, sanitary sewers, laterals, and storm sewers shall be installed as necessary to prevent the future cutting of pavement of any street, sidewalk or other required pavement.
(Prior Code, § 16-10-32)
(C) Property markers. The curves of all lots and the beginning and ending of all curves on property lines shall be accurately marked on the ground with three-fourth inch diameter iron rods or pipes at least 24 inches long prior to final approval of the final plat.
(Prior Code, § 16-10-33)
(D) Streets and alleys. The subdivider shall provide street pavements which shall be designed to carry the expected traffic and which shall be approved by the City Council.
(Prior Code, § 16-10-34)
(E) Curbs and gutters. Curbs and gutters shall be placed on both sides of all streets in all non-residential subdivisions and all residential subdivisions having more than three lots per gross acre, unless they are waived by the City Council.
(Prior Code, § 16-10-35)
(F) Sidewalks. Portland cement concrete sidewalks, no less than four feet wide and four inches thick shall be constructed on both sides of all streets within a subdivision having more than three lots per gross acre, unless waived by the City Council.
(Prior Code, § 16-10-36)
(G) Street signs. The subdivider shall install durable street name signs at all intersections which meet specifications of the City Council. One street sign is required for each intersection unless waived by the City Council.
(Prior Code, § 16-10-37)
(H) Water supply system. The subdivider shall construct a complete water distribution system which shall adequately serve all lots and which shall include appropriately spaced fire hydrants, and this system shall be properly connected with the public water supply.
(Prior Code, § 16-10-38)
(I) Sanitary sewers. The subdivider shall construct a subdivision sewer system to adequately serve all lots and connect the subdivision system to the public system after the City Council has approved the size of the lines.
(Prior Code, § 16-10-39)
(J) Storm drainage. An adequate drainage system including necessary open ditches, pipes, culverts, intersectional drains, drop inlets, bridges etc., for the proper drainage of all surface water shall be provided. Cross drains shall be provided to accommodate all natural water flow, and they shall be of sufficient length to permit full width roadways and required slopes.
(Prior Code, § 16-10-40)
(K) Oversize facilities. The City Council may participate in the cost of oversize improvements within a subdivision if it is adjudged that such oversize improvements are necessary to serve large areas of land not in the subdivision and if the cost of such oversize improvements is an unreasonable burden on the subdivider.
(Prior Code, § 16-10-41)
(L) Inspection. Each facility constructed in the subdivision shall be installed under inspection of the
engineer.
(Prior Code, § 16-10-42)
Statutory reference:
Related provisions, see SDCL Chapter 9-43, Chapter 9-47, Chapter 9-48, Chapter 11-3, Chapter 11-4, Chapter 11-7, §§ 9-30-3, 9-45-1, 9-45-3, 9-46-1, 11-3-12.1