§ 153.20 PERMIT TO DRILL REQUIRED.
   Before any well may be drilled within the corporate limits of the city, an application for a permit must be filed with the Director of Public Works. A permit must be obtained from the Board of Commissioners before drilling operations begin, and the permit is nontransferable.
(Ord. 380, passed ll-17-80) Penalty, see § 153.99