(a) Prior to any installation of any sewer taps, the applicant must request written permission of the City before crossing any street, road, alley or public driveway. The City will elect if the applicant is permitted to bore the lateral under said roadway or is permitted open-cut excavation through said roadway. The City may direct the applicant to take any additional requirements as are necessary to secure or protect the lateral or the sewer tap. The same bond requirement is required for both forms of installation.
(b) All excavations herein permitted shall be closed in the manner prescribed and the materials approved by the Service-Safety Director, and within five days from the time that such excavation was started, unless an extension of time is secured from the Director for good cause shown.
(c) The repair or replacement of sidewalks caused by opening in streets, alleys or public grounds shall be considered to be a repair or replacement of an improved street and the deposit for same shall be in conformity with Section 903.02 concerning any deposit required for the opening of an improvement street.
(d) See Appendix “A 1-7". (Ord. 49-2002. Passed 11-4-02.)