(a) Extension Costs. The cost of sanitary sewer line extensions and connections shall be paid by the developer or individual requesting the sanitary sewer line.
(b) Distance of Extension. Sanitary sewer lines shall be extended the full distance across the development, tract or lot that is to be serviced, i.e., to the farthest point of the lot line, except where the City Engineer determines it is not practicable.
(c) Size of Line. The size of a sanitary sewer line shall be determined by the City Engineer, based on requirements for the satisfactory servicing of present and future areas to be serviced.
(d) Lines to be City Property. All sanitary sewer lines after installation, shall become the property of the City, and all maintenance thereon shall be the responsibility of the City.
(Ord. 32-2002. Passed 8-20-02.)