923.06 EQUIPMENT.
   (a)    Shut-off valves shall be installed on all industrial connections to the sewer system at the expense of the industry making the connection. The valve shall be controlled only by the Superintendent or his authorized personnel.
 
   (b)    A non-clog type of measuring device shall be installed on all industrial discharge lines connected to the sewer system and continuous type recording devices (twenty-four hours) shall be installed at the Waste Water Works and telemetering shall be provided for and maintained. The installation and maintenance for this equipment shall be borne by the industry discharging the industrial wastes.
(Ord. 13-2001. Passed 2-20-01.)