(a) Conflict of Numbers. It shall be the duty of the City Engineer to inform any party applying therefore of the numbers or number belonging to or embraced within the limits of any lot or property as provided in this chapter. In the case of conflict as to the proper number to be assigned to any building, the City Engineer shall determine the number of such building.
(b) New Buildings. Whenever any building is erected or located in the City after the establishment of the uniform system has been completed, it shall be the duty of the owner to procure the correct number or numbers as designated from the City Engineer for the property and to immediately fasten the number or numbers so assigned upon such building as provided by this Chapter. A work permit shall not be issued for any house, building or structure until the owner has procured from the City Engineer the official number of the premises. The Zoning Administrator shall withhold final approval of any structure erected, repaired, altered or modified until permanent and proper numbers have been affixed to such structure.
(Ord. 86-2005. Passed 12-19-05.)