(a) "PEV" means a plug-in electric Vehicle or Motor Vehicle, as defined in Codified Ordinance Chapter 402, that can utilize an external source of electricity (such as a wall socket that connects to the power grid) to store electrical energy within its onboard rechargeable battery packs, to power an electric motor and help propelling the wheels.
(b) "Charging Station" means a PEV battery charging station located on a public or private parking space which permits the transfer of electric energy (by conductive or inductive means) to a battery or other storage device in a PEV. Charging Stations are outlined as follows:
(1) AC Level 1 chargers use a standard 120V household outlet, but provide slow charging speeds, usually a minimum of 24 hours.
(2) AC Level 2 charging stations require a 240V outlet and charge in approximately four to ten hours.
(3) AC Level 3/DC Level 2, known as DC Fast Charging Stations, charge in approximately 30 to 45 minutes.
(c) "EVSE" means an electric vehicle supply equipment, as defined in the National Electric Code, is the installation and/or maintenance of AC Level 1, AC Level 2 and AC Level 3/DC Level 2 Charging Stations. Any required building permits, electrical permits or other applicable permits shall be obtained prior to the location, construction, installation, or operation of EVSE in the City of Brunswick.
(Ord. 45-2023. Passed 9-25-23.)