1236.16 INSTALLATION OF WATER QUALITY BEST MANAGEMENT PRACTICES.
   The owner may not direct runoff through any water quality structures until the site has reached final stabilization as determined by the City Engineer. This is required to prevent the clogging of any of the constructed facilities with sediment due to erosion from un-stabilized areas. This occurs after the completion of the final grade at the site, after all of the utilities are installed, and the site is subsequently stabilized with vegetation or other appropriate methods. The developer must provide documentation acceptable to the City Engineer to demonstrate that the site is completely stabilized. Upon this proof of compliance, the water quality structure(s) may be completed and placed into service. Upon completion of installation of these SCMs, all disturbed areas and/or exposed soils caused by the installation of these SCMs must be stabilized within two (2) days.
(Ord. 81-2022. Passed 11-14-22.)