The SWP3 and Abbreviated SWP3 review, filing, and inspection fee reserve is part of a complete submittal and is required to be submitted to the City of Brunswick before the review process begins. Please consult with City of Brunswick Engineer for the current fee reserve schedule. At such time that the fee reserve balance falls below thirty-five percent (35%) of its original balance the owner may be required to deposit additional funds to cover the anticipated costs of future fees or return the reserve to the original balance as determined by the City Engineer. (Ord. 80-2022. Passed 11-14-22.)