The SWP3 must contain a description of the controls appropriate for each stage of construction operation and the applicant must implement such controls. BMP selection and design must meet the criteria established within the current Construction General Permit. BMP’s must be designed, constructed, and installed to meet the specifications in the Rainwater and Land Development or another design manual acceptable to the City of Brunswick. The approved SWP3, and the sediment and erosion controls, and non-sediment pollution controls contained therein, shall be implemented, and maintained according to the requirements in the Construction General Permit. Site operators must conduct site inspections as described in the Construction General Permit. The following shall also apply:
(a) FINAL STABILIZATION. Final stabilization shall be determined by the City of Brunswick Engineer. Once a definable area has achieved final stabilization, the owner may note this on the SWP3 and no further inspection requirement applies to that portion of the site. Final stabilization also requires the installation of permanent (post-construction) stormwater control measures (SCMs). Obligations under this chapter shall not be completed until installation of post-construction SCMs is verified.
(b) DISPOSITION OF TEMPORARY PRACTICES. All temporary and permanent erosion and sediment control practices shall be disposed of within thirty days after final site stabilization is achieved or after the temporary practices are no longer needed, unless otherwise authorized by the City Engineering Department. Trapped sediment shall be permanently stabilized or removed to prevent further erosion.
(Ord. 80-2022. Passed 11-14-22.)