(a) Utility Easements. Electric and telephone lines should be located along rear or side lot lines and shall be buried. Easements along rear or side lot lines shall be provided for utilities where necessary and shall be at least sixteen feet wide.
(Ord. 41-2022. Passed 7-11-22.)
(b) Drainage Easements. Wherever a subdivision is traversed by a drainage way, a storm water or drainage easement, conforming substantially with the lines of such drainage way, shall be provided. The easement shall be no less than twenty feet wide and, unless increased by the City Engineer, shall generally follow rear and side lot lines.
(Ord. 95-71. Passed 1-24-72.)