TABLE D - DEDICATION AND PLAT APPROVAL
Ord. No.   Date   Description
18-60   6-20-60   Approving the plat of the J. and R. Building Co.’s Subdivision No. 8 and dedicating a portion of Joseph Pkwy.
65-60   10-17-60   Approving the plat of J. and R. Building Corp.’s Subdivision No. 11 and dedicating a portion of Junior Pkwy.
54-61   8-28-61   Approving a portion of the plat of the J. and R. Builder's Subdivision No. 12.
56-61   8-28-61   Approving the plat of J. and R. Building Co.’s Subdivision No. 13 and accepting the dedication of portions of Alda Pkwy and Gladys Dr.
67-61   10-9-61   Approving the plat of Jotom Building Co.’s Subdivision No. 2
      and accepting the dedication of portions of Ruth Dr.
71-61   10-23-61   Approving the plat of Morris - Black Subdivision No. 2 and
      accepting the dedication of portions of Cherry Lane.
7-62   1-8-62   Accepting the plat of Sun Valley Estates Phase 1, Lots 28 and 33, Tract 2.
36-62   4-9-62   Amends Ord. 7-62.
51-62   5-14-62   Approving the plat of Jotom Building Co.’s Subdivision No. 3 and accepting the dedication of portions of Ruth Dr. and Penny's Dr.
93-62   4-22-63   Approving the plat of the J. and R. Building Co.’s Subdivision No.13 for recording.
94-62   10-8-62   Approving the plat of the J. and R. Building Co.’s Subdivision No. 14 for recording.
105-62   11-12-62   Approving the plat of the Jotom Building Co.’s Subdivision No. 4 for recording.
79-63   10-21-63   Approving the plat of the Wolff's Subdivision No. 5 for recording.
42-64   5-11-64   Accepting the plat of Economy Homes Subdivision No. 1, Tract 2, Lot 3.
55-64   7-13-64   Accepting Regency Park Phase 1 Subdivision for record purposes only.
58-64   7-13-64   Accepting Colony Park Subdivision No. 14 for record purposes only.
63-64   7-27-64   Accepting the plat of Belle's Brunswick Park Subdivision No. 3.
79-64   9-28-64   Accepting the plat of the J. Scott Subdivision.
82-64   9-28-64   Accepting Colony Park Subdivision No. 15 for record purposes only.
83-64   9-28-64   Accepting Colony Park Subdivision No. 16 for record purposes only.
Res. 9-65   1-25-65   Approving the resubdivision of Regency Park Subdivision Phase 1.
29-65   4-12-65   Approving the resubdivision of Wolff's Subdivision No. 5 for record purposes only.
44-65   5-24-65   Approving the preliminary plat of Eagle Oaks Subdivision.
Res. 46-65   6-14-65   Approving a resubdivision of Keller Allotment, Sublots 67, 68,69,70,71 and 71-A.
59-65   8-9-65   Acceptance of the plat of Colony Park Subdivision No. 17.
Ord. No.   Date   Description
60-65   8-9-65   Acceptance of the plat of Colony Park Subdivision No. 18.
61-65   8-9-65   Approving the subdivision plat known as Regency Park, Phase 2.
62-65   8-9-65   Acceptance of the plat of Eagle Oaks Subdivision No. 1.
63-65   8-9-65   Acceptance of the plat of Eagle Oaks Subdivision No. 2.
Res. 76-65   9-27-65   Accepting the preliminary plat of Holiday Hills Subdivision.
Res. 89-65   12-13-65   Approving the subdivision plat known as Regency Park, Phase 3.
15-66   3-28-66   Approving the plat of Colony Park Subdivision No. 17 for recording purposes only.
16-66   3-28-66   Approving the plat of Colony Park Subdivision No. 19 for recording purposes only.
Res. 21-66   4-25-66   Approving plat of Smith Subdivision No. 1 for record purposes only.
Res. 22-66   4-25-66   Approving the resubdivision of Holiday Hills Subdivision, Phase 1.
Res. 31-66   5-9-66   Approving Regency Park Subdivision, Phase 3, for record purposes only.
Res. 32-66   4-25-66   Approving the resubdivision of Beverly Hill's Subdivision No. 2.
Res. 39-66   7-11-66   Approving the plat of Eastlawn Memorial Gardens for location of roads only.
Res. 69-66   10-24-66   Approval of Heritage Park plat for record purposes only.
2-67   1-9-67   Approving the plat of Eagle Oaks Subdivision No. 3.
Res. 6-67   1-23-67   Approving a certain preliminary plat known as Old Mill Village Subdivision.
Res. 7-67   1-23-67   Approving a certain preliminary plat known as Shadynook Inc. Subdivision.
Res. 12-67   2-13-67   Approving Shadynook Subdivision No. 1.
Res. 26-67   4-10-67   Approving the plat of Heritage Park Subdivision for lot size and street location only.
Res. 29-67   4-24-67   Approving the plat of Clarence Murphy Subdivision for lot size and location of streets only.
Res. 37-67   5-22-67   Approving the plat of Old Mill Village Subdivision No. 1.
Res. 38-67   5-22-67   Approving the preliminary plat of the Women's Federal Savings and Loan Subdivision.
Res. 39-67   6-12-67   Approving the preliminary plat of Forco, Inc. Subdivision.
Res. 49-67   6-12-67   Approving the plat of Eagle Oaks Subdivision No. 4.
Res. 50-67   6-12-67   Approving the plat of Heritage Park Subdivision No. 1.
Res. 52-67   6-26-67   Approving the plat of Women's Federal Savings and Loan Subdivision.
Res. 51-67   7-10-67   Approving the plat of Forco, Inc. Subdivision.
Res. 56-67   8-14-67   Approving the plat of Shadynook Subdivision No. 1.
Res. 57-67   7-10-67   Approving the plat of Holiday Hills Subdivision No. 1.
Res. 58-67   7-10-67   Approving Block A, B and C within Holiday Hills Subdivision No. 1.
Ord. No.   Date   Description
Res. 63-67   7-24-67   Approving a certain preliminary proposed development known as Coventry Terrace Subdivision No. 1.
Res. 66-67   9-11-67   Approving the plat of Blocks A, B and C in the Holiday Hills Development.
Res. 69-67   8-14-67   Approving a plat known as Cummings Pkwy for record purposes only.
14-68   4-8-68   Approving the plat of Eagle Oaks Subdivision No. 5.
Res. 35-68   5-27-68   Approving the plat of Hickory Hills Subdivision, Phase 1.
Res. 51-68   7-22-68   Approving the preliminary plat of Kingston Estates.
Res. 57-68   7-22-68   Approving the plat of Heritage Park Subdivision, Phase 2, for record purposes only.
67-68   3-24-69   Approving the plat of Andrew Teklitz Subdivision No. 2 for record purposes only.
68-68   9-23-68   Approving the plat of Holiday Hills Subdivision No. 1 for record purposes only.
78-68   10-14-68   Approving a revised preliminary plat known as Eagle Oaks Subdivision.
79-68   10-28-68   Approving the plat of Eagle Oaks Subdivision No. 6.
Res. 63-69   6-23-69   Approving the preliminary plat known as Maplewood Homes Subdivision.
Res. 64-69   6-23-69   Approving the plat of Hickory Hill Subdivision Phase 2, for record purposes only.
Res. 76-69   6-27-69   Approving the preliminary plat known as Wallace E. Lockyer Subdivision.
Res. 97-69   11-24-69   Approving a plat known as Coventry Estates Subdivision No. 1.
Res. 101-69   9-22-69   Approving the plat of Holiday Hills Subdivision No. 1 for record purposes only.
Res. 107-69   10-13-69   Approving the plat of Holiday Hills Subdivision No. 2 for record purposes only.
Res. 27-70   2-23-70   Approving a preliminary proposed townhouse development known as Maplewood Homes, Inc.
Res. 34-70   3-9-70   Approving a preliminary proposed residential subdivision known as Coventry Estates.
Res. 35-70   3-9-70   Approving a preliminary proposed residential subdivision known as Franklin Bros. Subdivision No. 1, Phase 6.
Res. 36-70   3-9-70   Approving a preliminary proposed residential development known as Maplewood Homes, Inc.
Res. 44-70   4-13-70   Approving a plat known as Coventry Estates Subdivision No.
Res. 47-70   4-27-70   Approving the plat of Hickory Hills Subdivision, Phase 3.
56-70      5-11-70   Approving the plat of Eagle Oakes Subdivision No. 7 for record purposes only.
75-70      5-25-70   Approving the plat of Maplewood Homes Phase 1 for record purposes only.
89-70      6-22-70   Approving the plat of Brunswick Industrial Park for record purposes only.
 
Ord. No.   Date   Description
104-70   8-31-70   Approving the plat of Heritage Park Subdivision No. 3 for record purposes only.
109-70   9-14-70   Approving the plat of Karder Subdivision for record purposes only.
113-70   10-12-70   Approving the plat of Heritage Park Subdivision No. 3 for record purposes only.
126-70   11-9-70   Approving the plat of Old Mill Village Subdivision, Phase 2, Sec. A, for record purposes only.
135-70   11-9-70   Approving the plat of Eagle Oakes Subdivision No. 8 for record purposes only.
146-70   12-4-70   Approving the plat of Bramblewood Subdivision No. 1 for record purposes only.
148-70   12-14-70   Approving the plat of Heritage Park Subdivision No. 4 for record purposes only.
Res. 16-71   1-25-71   Approving a preliminary plat known as Presidential Development Co. Subdivision.
Res. 23-71   2-15-71   Accepting an offer to dedicate Inner Circle Dr.
33-71   3-22-71   Approving the revised plat of Heritage Park Subdivision No. 3 for record purposes only. Repeals Ords. 104-70 and 113-70.
39-71   3-22-71   Accepting an offer to dedicate Bennington Blvd.
43-71   4-15-71   Approving the plat of Brunswick Industrial Park Subdivision, Phase I, for record purposes only.
Res. 48-71   5-24-71   Approving a preliminary plat known as Laurel Creek Subdivision.
Res. 49-71   4-26-71   Approving a preliminary plat known as Eagle Oaks II Subdivision.
Res. 50-71   5-10-71   Approving a preliminary plat known as Holiday Hills Subdivision No. 3.
51-71   4-26-71   Approving the plat of Coventry Estates Subdivision No. 2 for record purposes only.
55-71   5-24-71   Approving the revised plat of Brunswick Industrial Park Subdivision, Phase I, for record purposes only.
56-71   5-24-71   Approving the plats of Eagle Oakes II, Subdivisions 9 and 10 for record purposes only.
60-71   7-26-71   Approving the plat of Laurel Creek Subdivision for record purposes only.
61-71   6-28-71   Approving the plat of Hickory Hill Subdivision, Phase IV, for record purposes only.
71-71   6-28-71   Approving the plat of Miller Dr. Subdivision No. 1 for record purposes only.
76-71   7-26-71   Approving the plats of Eagle Oakes II, Subdivisions 9 and 10 for record purposes only.
80-71   7-26-71   Approving the plat of a resubdivision of Sublot Nos. 114 and 115 in Holiday Hills Subdivision No. 2 and No. 3 for record purposes only.
Res 84-71   7-26-71   Approving a preliminary plat known as Laurel Land Co. Subdivision.
Ord. No.   Date   Description
91-71   9-13-71   Approving the plat of Maplewood Homes Subdivision No. 2 for record purposes only.
92-71   9-13-71   Approving the plat of Old Mill Village Subdivision No. 3 for record purposes only.
Res. 94-71   10-11-71   Approving a preliminary plat known as Residential Development Co. Subdivision (formerly known as Presidential Development Co. Subdivision).
100-71   11-8-71   Approving the plat of R.A. Gall Subdivision No. 1 for record purposes only.
Res. 101-71   10-11-71   Approving a preliminary plat known as R.A. Gall Subdivision.
105-71   11-8-71   Approving the plat of Old Mill Village Subdivision No. 4 for record purposes only.
Res. 106-71   10-11-71   Approving a preliminary plat known as the Greg Frantz Subdivision.
Res. 107-71   11-8-71   Approving a revised preliminary plat known as Franklin Bros. Bldg. & Realty Co. Subdivision No. 1, Phase 6.
Res. 113-71   12-13-71   Approving a preliminary plat known as Shady Nook Subdivision.
114-71   12-13-71   Approving the plat of Residential Development Co. ‘s Subdivision No. 1 for record purposes only.
122-71   2-14-72   Approving the plat of Hickory Hill Subdivision, Phase V, for record purposes only.
123-71   2-28-72   Approving the replat of Heritage Park Subdivision, Phase III, for record purposes only.
10-72   2-14-72   Approving the plat of Colony Heights Subdivision for record purposes only.
Res. 16-72   3-13-72   Approving a preliminary plat known as Hilltop Homes, Inc.
24-72   3-13-72   Approving the plat of Eagle Oakes Subdivision, Phase 11, for record purposes only.
31-72   4-24-72   Approving the plat of R.A. Gall Subdivision No. 2 for record purposes only.
Res. 32-72   3-13-72   Approving a preliminary plat known as Eagle Oakes Subdivision.
Res. 38-72   4-24-72   Approving a revised preliminary plat known as Maplewood Homes Subdivision.
Res. 54-72   6-12-72   Approving a revised preliminary plan known as Holiday Hills Subdivision No. 3, Phase II.
55-72   7-24-72   Approving the revised plat of Holiday Hills Subdivision No. 3, Phase II for record purposes only.
62-72   6-26-72   Approving the plat of Hilltop Homes Subdivision No. 1.
63-72   6-26-72   Approving the plat of Maplewood Homes Subdivision No. 3.
68-72   7-10-72   Approving the plat of Lazy Day Subdivision No. 1.
81-72   9-11-72   Approving the plat of Cherry Lane Subdivision No. 1.
82-72   9-11-72   Approving the plat of Coventry Estates Subdivision, Phase 3.
84-72   7-10-72   Approving the plat of R.A. Gall Subdivision No. 2.
85-72   7-10-72   Approving the plat of Presidential Development Co.’s Subdivision No. 1.
Ord. No.   Date   Description 
86-72   7-10-72   Approving the plat of Hickory Hill Subdivision, Phase V.
90-72   7-24-72   Approving the plat of the resubdivision of part of Maplewood Homes Subdivision No. 3.
111-72   9-18-72   Approving the plat of Regency Park Subdivision, Phase V.
115-72   9-25-72   Accepting certain streets in Eagle Oakes Subdivision Nos. 5, 6, 7 and 8.
Res. 30-73   3-12-73   Approving a preliminary plan known as Maplewood Homes Subdivision No. 4.
33-73   2-26-73   Approving the plat of Eagle Oakes Subdivision No. 10.
Res. 34-73   3-26-73   Approving a preliminary plan known as Brookside Park Estates Subdivision.
42-73   4-23-73   Approving the plat of Old Mill Village Subdivision No. 6.
Res. 43-73   4-23-73   Approving a preliminary plan known as Mesa Grande Subdivision.
44-73   5-14-73   Approving the plat of Mesa Grande Subdivision, Phase I.
59-73   6-11-73   Approving the plat of Heritage Park Subdivision, Phase V.
86-73   7-23-73   Approving the plat of Presidential Development Co.’s Subdivision No. 2.
87-73   7-23-73   Approving the plat of Springarden, Ambrose and Canterbury Drs.
88-73   7-23-73   Approving the plat of Wirth Ave.
89-73   7-30-73   Approving the plat of Maplewood Homes Subdivision No. 4.
Res. 95-73   9-24-73   Approving a preliminary plat known as Colony Park Subdivision No. 17.
96-73   9-24-73   Approving the plat of Past Development Co.’s Subdivision No. 17.
107-73   9-24-73   Approving the plat of Laurel Land Co.’s Subdivision No. 4.
108-73   9-24-73   Approving the plat of Laural Land Co.’s Subdivision No. 5.
116-73   12-10-73   Approving the plat of Shady Nook Subdivision.
118-73   10-8-73   Approving the plat of Presidential Development Co.’s Subdivision No. 3.
125-73   10-22-73   Approving the plat of Brookside Park Estates Subdivision.
128-73   10-22-73   Approving the plat of Eagle Oakes Subdivision No. 12.
138-73   12-3-73   Approving the plat of Mesa Grande Subdivision, Phase II.
156-73   12-10-73   Approving the plat of Pepperwood Subdivision.
Res. 37-74   3-25-74   Approving a preliminary plan known as Franklin Bros. Bldg.. & Realty Co.’s Subdivision.
46-74   5-13-74   Approving the plat of Franklin Bros. Bldg. & Realty Co.’s Subdivision No. 1.
138-74   11-11-74   Approving the plat of Old Mill Village Subdivision No. 7.
115-75   11-24-75   Approving the plat of New Boston Knolls Subdivision.
Res. 138-75   12-22-75   Approving, with conditions, preliminary plan known as Forest Meadows Subdivision.
27-76   4-26-76   Approving final plat of Forest Meadows Subdivision.
80-76   9-15-76   Approving the plat of R. and R. Land Company's Subdivision No. 3, in the City of Brunswick, Ohio.
Ord. No.   Date   Description
93-76   4-11-77   Approving plat of Hickory Hill Subdivision, Phase 6.
96-76   9-27-76   Designating 1403 Pearl Road, known as Old City Hall, Lot 15, Tract 1, as a City mini-park.
109-76   11-8-76   Accepting dedication of Industrial Parkway for public use.
86-77   9-26-77   Approving re-plat of Blocks F and G in the Forest Hills-Holiday Hills Subdivision Phase II and Phase Ill.
112-77   4-10-78   Approving plat of R. and R. Land Co.’s Subdivision No. 4.
113-77   4-10-78   Approving plat of R. and R. Land Co.’s Subdivision No. 5.
Res. 21-78   3-27-78   Approving preliminary plan known as Pumpkin Ridge Estates Subdivision, consisting of 50.05 acres.
26-78   4-10-78   Accepting for maintenance the streets in Brunswick Industrial Park Subdivision Phase I, known as Industrial Parkway North.
Res. 44-78   5-22-78   Approving preliminary plan known as Green Meadows Sub division, containing 56 acres.
60-78   6-26-78   Approving plat of Pannonia Inc., Old Mill Village Subdivision No. 8, consisting of 8.3932 acres.
61-78   7-10-78   Approving final plat of Pumpkin Ridge Estates Subdivision, consisting of 50.05 acres.
Res. 77-78   7-24-78   Approving preliminary plan known as Woodstock Village Subdivision, consisting of 38.109 acres.
9-79   3-1-79   Approving final plat of Woodstock Village Subdivision.
22-79   3-26-79   Accepting for record purposes only, dedication plat of Dennis Lane, consisting of approximately 1256.7 linear feet.
Res. 72 -79   7-23-79   Approving preliminary plan known as Concord Meadows Subdiviston, consisting of 59.918 acres.
Res. 137-79   7-28-80   Approving preliminary plan known as Devonshire Subdivision, consisting of 19.57 acres.
109-80   6-23-80   Approving plat known as industrial Parkway Phase II.
Res. 53-82   5-10-82   Approving preliminary plan known as Snapper Creek Subdivision.
Res. 22-84   2-27-84   Approving preliminary plan for the Osborne private street.
Res. 80-84   5-30-84   Approving preliminary plan for Hopkins Subdivision.
115-84   9-10-84   Amends Res. 22-84.
Res. 62-85   7-22-85   Approving preliminary plan for Alpine Hill Subdivision.
Res. 79-85   9-23-85   Approving preliminary plan for Oak Tree Village Subdivision; repeals Res. 37-74.
Res. 90-86   10-27-86   Approving preliminary plans for Gallo Subdivision.
67-87   6-22-87   Approving plat of Gallo Subdivision Phase 1.
68-87   6-22-87   Approving plat of Old Mill Village Subdivision No. 9.
Res. 80-87   9-14-87   Approving preliminary plan for Oak Tree Village Subdivision; repeals Res. 37-74 and 79-85.
Res. 81-87   9-14-87   Approves preliminary plan for Concord Meadows Sub-division; repeals Res. 72-79.
Res. 84-87   10-12-87   Approves the preliminary subdivision plan for Brunswick Industrial Park, Phase III, IV and V.
Ord. No.   Date   Description
90-87   9-14-87   Approves plat of Concord Meadows Subdivision Number One.
49-88   5-9-88   Approves plat of Brunswick Industrial Park, Phase Ill.
60-88   5-23-88   Approves plat of Concord Meadows Subdivision, Number Two.
96-88   10-17-88   Approves plat of Concord Meadows Subdivision, Number Three.
Res. 105-88   10-24-88   Approving preliminary plans for Bridgeport Estates Subdivision.
39-89   4-24-89   Approves plat of Bridgeport Estates Subdivision, Phase I.
49-89   5-8-89   Approves plat of Concord Meadows Subdivision, No. 4.
111-89   9-25-89   Approves plat of Hopkins Subdivision.
126-89   11-13-89   Approves plat of Old Mill Village Subdivision, Phase 10.
148-89   12-11-89   Accepts the dedication plat for realignment of West Laurel Road.
41-90   4-9-90   Approves plat of Bridgeport Estates Subdivision, Phase II.
Res. 61-90   7-9-90   Approves the preliminary subdivision plan for Oak Tree Village.
63-90   6-11-90   Approves plat of Cross Creek Subdivision.
74-90   7-9-90   Approves the preliminary subdivision plans for Beechwood Estates Subdivision.
87-90   8-29-90   Approves the preliminary subdivision plan for Arlington Estates Subdivision.
110-90   10-8-90   Approves the plat of Concord Meadows Subdivision No. 5.
Res. 120-90   11-12-90   Approves the preliminary subdivision plan for Sandra Hills Subdivision.
25-91   2-11-91   Approves the plat of Gallo Subdivision Phase II.
90-91   6-24-91   Approves the plat of Arlington Estates Subdivision, Phase I and II.
91-91   6-24-91   Approves the plat of Concord Meadows Subdivision, Number Six.
109-91   10-16-91   Approves the plat of Oak Tree Village Subdivision, No. 1.
110-91   9-9-91   Approves the plat of Sandra Hills Subdivision, Phase 1.
148-91   10-28-91   Approves plat of Old Mill Village Subdivision, Phase II.
Res. 9-92   1-27-92   Authorizes the acceptance of Block "D" in Bridgeport Estates Subdivision.
72-92   5-27-92   Approves the plat of Parkside Estates Subdivision, Phase I.
107-92   7-27-92   Approves the plat of Brunswick Industrial Park Subdivision, Phase IV.
110-92   7-27-92   Approves the plats of Oak Tree Village Subdivision, Phases 2and 3.
Res. 25-93   3-22-93   Approves the Quail Hollow Preliminary Subdivision Plan.
35-93   4-12-93   Approves the plat of Old Mill Village Subdivision, Phase 12.
36-93      4-12-93   Approves the plat of Shenandoah Subdivision, Number One.
56-93      5-24-93   Approves the plat of Southbridge Estates Subdivision, Phase One.
Res. 70-93   7-12-93   Approves the preliminary subdivision plan for Parkside Commons Cluster Homes.
 
Ord. No.   Date   Description
Res. 75-93   7-26-93   Approves the preliminary subdivision plan for Shenandoah Village Cluster Homes.
76-93   7-26-93   Approves the plat of Parkside Estates Subdivision, Phase II.
107-93   11-8-93   Approves the plat of Timbers Subdivision, Phase I.
113-93   11-22-93   Approves the plat of Devonshire Woods Subdivision, Phase 1.
17-94   1-24-94   Approves the plat of Quail Hollow Subdivision, Phase 1.
18-94   1-24-94   Approves the plat of Southbridge Estates, Phase 2.
Res. 23-94   2-14-94   Approves the preliminary subdivision plan for Stone Creek Subdivision.
Res. 24-94   3-14-94   Approves the preliminary subdivision plan for Fairways Subdivision.
Res. 25-94   2-14-94   Approves the Hobbit’s Glen preliminary subdivision plan.
45-94   3-28-94   Approves the final plat for the Timbers Subdivision, Phase 2.
Res. 46-94   3-28-94   Approves the preliminary subdivision plan for quail Hollow Subdivision, Phase 2.
47-94   3-28-94   Approves the final plat for Quail Hollow Subdivision, Phase .
56-94   4-11-94   Approves the final plat for Benjamin Farm Subdivision, Phas 1.
Res. 57-94   4-11-94   Approves the preliminary subdivision plan for Ashton Woods Estates Subdivision.
62-94   4-25-94   Approves the final plat for Devonshire Woods Subdivision,Phase II.
72-94   6-13-94   Approves a replat of a portion of Block “J” of Phase IV of the Brunswick Industrial Park purchased for the Eaton Corp. building.
Res. 81-94   6-27-94   Approves the preliminary subdivision plan for North Park Estates Subdivision.
109-94   9-12-94   Approves the final plat for the Fairways Subdivision, Phase I.
119-94   9-26-94   Approves the final plat for Old Mill Village Subdivision, Phase 14.
133-94   10-24-94   Approves the final plat for Gallo Subdivision, Phase III.
Res. 148-94   11-28-94   Approves the preliminary subdivision plan for Waterford Village Subdivision.
147-94   1-9-95   Approves the replat of Block “C” of Arlington Estates Subdivision, Phase I.
Res. 156-94   1-9-95   Approves the preliminary subdivision plan for Golden Estates Subdivision.
Res. 1-95   1-9-95   Approves the preliminary plan for Pine Brook Estates and Pine Brook Village Subdivision.
5-95   1-23-95   Approves the final plat for North Park Estates Subdivision, Phase I.
Res. 24-95   3-27-95   Approves the preliminary subdivision plan for Hadcock Estates Subdivision.
Res. 26-95   3-27-95   Approves the Links preliminary subdivision plan.
83-95   7-10-95   Approves the final plat for Waterford Village Subdivision, Phase I.
Ord. No.   Date   Description
101-95   9-25-95   Approves the final plat for Stone Creek Subdivision, Phase I.
116-95   10-23-95   Approves the final plat for Pine Brook Estates, Phase I.
122-95   10-23-95   Approves the final plat for Hadcock Estates Subdivision.
141-95   12-11-95   Approves the final plat for Ashton Woods Estates Subdivision, Phase I.
40-96   4-8-96   Approves the final plat for Waterford Village Subdivision, Phase 2.
41-96   4-8-96   Approves the final plat for Waterford Village Subdivision, Phase 3.
56-96   6-10-96   Approves the final plat for Fairways Subdivision, Phase 2.
57-96   6-10-96   Approves the final plat for Fairways Subdivision, Phase 3.
84-96   7-22-96   Approves the final plat for Benjamin Farm Subdivision, Phase 2.
85-96   7-22-96   Approves the final plat for Golden Estates Subdivision, Phase 1.
86-96   7-22-96   Approves the final plat for Shenandoah Subdivision, Phase 2(A).
93-96   9-9-96   Approves the final plat for Quail Hollow Subdivision, Phase 3.
107-96   9-9-96   Approves the final plat for Waterford Subdivision, Phase 4.
143-96   11-11-96   Approves the final plat for Woodlands Subdivision, Phase I.
166-96   12-16-96   Dedicates the portion of Eastwood Drive north of Anderson Drive.
167-96   12-16-96   Approves the final plat for Miller Drive Subdivision, Phase No. 2.
12-97   1-13-97   Approves the final plat for Woodlands Subdivision, Phase II.
35-97   3-10-97   Approves the final plat for the Oak Tree Village Subdivision, Phase 4.
36-97   3-10-97   Approves the final plat for the Oak Tree Village Subdivision, Phase 5.
58-97   4-28-97   Approves the final plat for the North Park Estates, Phase Two.
Res. 59-97   4-28-97   Accepts Blocks “B” and “C” in North Park Estates Subdivision.
77-97   5-27-97   Accepts the final plat for Fairways Subdivision, Phase IV.
78-97   6-9-97   Accepts the final plat for Ashton Woods Subdivision, Phase No. 2.
79-97   6-9-97   Accepts the final plat for the Woodlands, Phase III.
122-97   9-8-97   Accepts the final plat for Benjamin Farm Subdivision, Phase III.
123-97   9-8-97   Accepts the final plat for Stone Creek Subdivision, Phase 2.
Res.126-97   9-22-97   Accepts the Park Land in Stone Creek Subdivision Phase 2.
129-97   9-22-97   Approves the final plat for Pine Brook Estates, Phase II.
Res.133-97   10-27-97   Authorizes acceptance of Blocks A and D in Parkside Estates Subdivision.
Res.134-97   10-27-97   Authorizes acceptance of Blocks A and B in Hadcock Estates Subdivision.
168-97   12-8-97   Accepts the plat for Brunswick South Business Park; the dedication of Corporate Drive and Industrial Parkway South and certain easements for public use.
Ord. No.   Date   Description
174-97   1-12-98   Approves the final plat for Shenandoah Subdivision, Phase Two B.
175-97   1-12-98   Approves the final plat for ARC Brunswick Limited Liability Subdivision.
9-98   1-26-98   Approves the final plat for Timber Hill Subdivision.
78-98   5-28-98   Approves the final plat for Pine Brook Estates, Phase III.
105-98   7-27-98   Approves the final plat for Ashton Woods Estates Subdivision, Phase 3.
106-98   7-27-98   Approves the final plat for Oak Tree Village Subdivision, Phase 6.
107-98   7-27-98   Approves the final plat for Cherryshire Woods Subdivision, Phase 1.
136-98   9-14-98   Approves the final plat for Shenandoah Subdivision, Phase 3.
144-98   10-26-98   Approves the final plat for Benjamin Farm Subdivision, Phase IV.
149-98   10-26-98   Approves the final plat for Stone Creek Subdivision, Phase 3.
150-98   10-26-98   Approves the final plat for Mueller Creek Subdivision, Phase 1.
6-99   1-25-99   Approves the final plat for Phase IV of Gallo Subdivision, and a replat of a portion of Phase III.
22-99   2-22-99   Approves the Charles Drive dedication plat.
70-99   6-14-99   Approves the final plat for Phase V of Benjamin Farm Subdivision.
120-99   10-18-99   Approving the final plat for Phase 2 of Golden Estates Subdivision.
121-99   10-18-99   Approving the final plat for Phase 2 of Mueller Creek Subdivision.
122-99   10-18-99   Approving the dedication plat for Industrial Parkway South, restricting access to a portion of the street and authorizing the City Manager to sign the plat.
135-99   10-25-99   Approving the final plat for Phase One of Cherry Hill Subdivision.
165-99   11-22-99   Approving the final plat for Phase Five of Fairways Subdivision.
7-00   1-10-00   Approving the replat of a portion of Phase 3 of Stone Creek Subdivision.
41-00   3-27-00   Approving the replat of a portion of Block J of Brunswick Industrial Park, Phase IV.
49-00   6-12-00   Approving the preliminary subdivision plan for Western Drive Industrial Park.
62-00   5-8-00   Approving the plat of Cherryshire Woods Subdivision, Number Two.
84-00   6-26-00   Approving the Timberlake Trail Cluster Home preliminary subdivision plan.
85-00   6-26-00   Approving the plat of Cherry Estates Subdivision, Phase Two.
91-00   7-10-00   Approving the plat for Parkwood Village Subdivision.
107-00   7-24-00   Approving the dedication plat of Block 4 in Brunswick South Business Park.
112-00   8-24-00   Approving the plat of Brunswick Commerce Center (Geis) Subdivision.
 
Ord. No.   Date   Description
130-00   9-25-00   Approving the plat of Creek Run Estates, Phase One.
131-00   9-25-00   Approving the plat of Creek Run Estates, Phase Two.
132-00   9-25-00   Approving the plat of Cherry Estates, Phase 3.
139-00   10-16-00   Accepting Blocks A and B of ARC Brunswick Limited Liability Company subdivision.
140-00   10-16-00   Approving the plat for Parkwood Village Subdivision.
149-00   11-13-00   Approving the Camden Circle Cluster Home preliminary subdivision plan.
3-01   1-22-01   Approving the plat of Fairways Subdivision, Phase Six.
43-01   5-14-01   Approving preliminary subdivision plan for Laurel Glen Cluster Homes, Phase 1.
69-01   6-11-01   Approving the preliminary subdivision plan for Cherryshire Woods Subdivision, Phase 3.
102-01   9-10-01   Approving the plat of Cherryshire Woods Subdivision, Phase 3.
115-01   10-8-01   Approving the plat of Laurel Glen Subdivision, Phase 1B.
148-01   11-12-01   Approving the Maxwell Boulevard dedication plat.
6-02   1-14-02   Approving the plat of Fairways Subdivision, Phase 7.
64-04   6-28-04   Authorizes the City Manager to sign the dedication plat for a portion of Fire Station No. 2 property.
65-04   6-28-04   Approving the plat of Laurel Glen Subdivision, Phase 3, Replat Number One.
119-04   10-11-04   Approving the plat of Greenbriar Colony Subdivision Phase 1.
135-04   10-18-04   Approving the plat for Holly Ridge Subdivision.
96-05   7-25-05   Approving the dedication plats of Brunswick Lake Parkway, Phases 1 and 2.
97-05   7-25-05   Approving the dedication plat for Parschen Blvd., Phase I.
98-05   7-25-05   Approving the plat of Brunswick Lake Southwest Neighborhood Subdivision, Phase 1.
Res.117-05   11-14-05   Authorizes the acceptance of Block B in Golden Estates Subdivision Phase 2.
56-06   7-24-06   Approving the final plat for the Waite Farms Subdivision, Phase One.
108-06      12-11-06   Approving the final plat for Greenbriar Colony Subdivision, Phase 2.
78-07      7-23-07   Approving the final plat of the Oak Hollow Subdivision.
25-09      2-23-09   Approving the Phase 3 final plat for Brunswick Town Center Special Planning District 2.
87-09      9-28-09   Approves final plat for Phase Two of the Waite Farms Subdivision.
125-10   1-10-10   Approves the final plat for the Waite Farms Subdivision, Phase Three.
43-13      5-13-13   Approves the final plat for Phase 1 of the Reserve at Autumn Creek.
70-13   4-28-14   Approves final plat for Phase 4 of the Waite Farms Subdivisions.
33-14   5-12-14   Approves Phase 2 detailed site plan for the Reserve at Autum Creek Special Planning District No. 3.
76-14   10-6-14   Approves the final plat for Phase 2 of the Reserve at Autumn Creek.
54-15   7-27-15   Approves the South Lake Subdivision Phase I final plat for the Brunswick Town Center Special Planning District No. 2 subject to final engineering approval and any other conditions imposed by Council.
55-15   7-27-15   Approves the Waite Farms Subdivision Phase 5 final plat subject to any other conditions imposed by Council.
76-15   10-26-15   Approves the Phase 3 detailed site plan for the Reserve at Autumn Creek Subdivision Special Planning District No. 3.
77-15   10-26-15   Approves the Phase 3 final plat for the Reserve at Autumn Creek Subdivision Special Planning District No. 3, subject to final engineering approval and any other conditions imposed by Council.
80-15   9-28-15   Approves the Revised South Lake Subdivision Phase I Final Plat for the Brunswick Town Center Special Planning District No. 2, subject to final engineering approval and any other conditions imposed by Council.
40-16      7-25-16   Approves the Phase 4 detailed site plan for the Reserve at Autumn Creek Subdivision Special Planning District No. 3.
41-16      7-25-16   Approves the Phase 4 final plat for the Reserve at Autumn Creek Subdivision Special Planning District No. 3, subject to final engineering approval and any other conditions imposed by Council.
80-16      12-12-16   Approving the phase 2 final plat for the Southlake subdivision located in the southwest neighborhood of the Brunswick Town Center Special Planning District No. 2.
43-17      7-10-17   Approving the phase 5 final plat for the reserve at Autumn Creek Subdivision Special Planning District No. 3, subject to final engineering approval and any other conditions imposed by Council.
130-17   3-12-18   Approving the Phase 6 detailed site plan for the Reserve at Autumn Creek Subdivision Special Planning District No. 3.
8-18      3-12-18   Approving the Phase 6 final plat for the Reserve at Autumn Creek Subdivision Special Planning District No. 3, subject to final engineering approval and any other conditions imposed by Council.
64-2021   6-14-21   Approving the final plat for the Vicky Drive extension (Overlook Pointe) development, subject to final engineering approval and any other conditions imposed by Council.
109-2021   12-20-21   Approving the final plat for the Ridgeline Chase Phase 1 Development, subject to final engineering approval and any other conditions imposed by Council.
21-2022   4-11-22   Approving the final plat for the Preserve at Meadow View Development, subject to final engineering approval and any other conditions imposed by Council.
22-2022   4-11-22   Approving the final plat for the Meijer’s Development, subject to final engineering approval and any other conditions imposed by Council.
65-2022   9-26-22   Approving the final plat for the Ridgeline Chase Phase 2 Development, subject to final engineering approval and any other conditions imposed by Council.
70-2022   10-10-22   Approving the final plat for the Oak Ridge Preserved Special Planning District No. 7, subject to final engineering approval and any other conditions imposed by Council.