§ 50.008  PRIVATE SEPTIC SYSTEMS PHASED OUT.
   Within six months following the date of hookup to the municipal sewer system of the city, all private septic systems, septic tanks, and dry wells shall be pumped in a manner consistent with the rules and regulations of the state’s Pollution Control Agency and any other applicable regulations, and shall then be removed, the locations from hence removed backfilled and compacted, or, following pumping, shall be filled with sand or other suitable, earthen, granular material.
(Prior Code Ch. 50, § 6)