(A) Improvement location permits.
(1) Residential.
(a) Single-family
1. Dwelling $425 + S0.10/sq. ft.
2. Addition $250 +$0.10/sq. ft.
3. Remodel $62.50 per discipline
a. (e.g., structural, electrical, electric meter/base, plumbing, mechanical)
(b) Two-family.
1. Dwelling $300/unit + $0.10/sq. ft.
2. Addition $250 + $0.10/sq. ft.
3. Remodel $62.50 per discipline
a. (e.g., structural, electrical, electric meter/base, plumbing, mechanical)
(c) Multiple-Family.
1. Dwelling $600/Building + $50/Unit
2. Foundation $300
3. Remodel
a. Structural $125 + $0.05/Sq. Ft.
b. Electrical $125 + $0.05/Sq. Ft.
c. Circuit panel/meter base $75
d. Plumbing $125 + $0.05/Sq. Ft.
e. Mechanical $125 + $0.05/Sq. Ft.
f. Fire Blocking $75
(d) Other.
1. Accessory structure $62.50 + $0.10/sq. ft.
2. Structure other than building $62.50
(2) Nonresidential.
(a) Commercial/industrial.
(1) Building $500 + $0.l0/sq. ft.
(2) a. Foundation only $300 + $0.10/sq. ft.
b. (If prior to full permit approval).
(3) Addition $375 + $0.10/sq. ft.
(4) Remodel
a. Structural $125 + $0.05/sq. ft.
b. Electrical $125 + $0.05/sq. ft.
c. Circuit panel/meter base $75
d. Plumbing $125 + $0.05/sq. ft.
e. Mechanical $125 + $0.05/sq. ft.
f. Fire blocking $75
(b) Other.
1. Accessory structure $300 + $0.10/sq. ft.
2. Structure other than building $125
(3) Wrecking/demolition.. $160 + $0.05/sq. ft.
(4) Relocating structure.
(a) Primary structure $150
(b) Accessory structure $62.50
(5) Swimming pool/spa.
(a) Pool, residential (above ground) $62.50
(b) Pool, residential (in-ground) $150
(c) Pool, commercial/public $300
(d) Spa, residential $30
(e) Spa, commercial/public $150
(6) Signs.
(a) Awning sign $62.50 + $1/sq. ft.
(b) Gateway sign $125 + $1/sq. ft.
(c) Ground sign $62.50 + $1/sq. ft.
(d) Pole sign $125 + $1/sq. ft.
(e) Projecting sign $62.50 + $1/sq. ft.
(f) Special temporary sign $31.25
(g) Wall sign (non-illuminated) $62.50 + $1/sq. ft.
(h) Wall sign (illuminated) $125 + $1/sq. ft.
(B) Inspections, other.
(1) Miscellaneous inspection $62.50
(2) Bond release inspection $200
(3) Notice of Termination (NOT) inspection $150
(4) Re-inspection.
(a) First additional $100
(b) Second additional $200
(c) Third or more $400
(5) Sanitary lateral inspection $62.50
(6) Pre-construction meeting $150
(7) Proof roll (e.g., streets/paths) $100/day
(8) Annual life-safety inspection $62.50
(C) Right-of-way.
(1) Maintenance bond, per application. $5,000
(2) Permit $125
(D) Other fees.
(1) Amendment to building/construction plan $75
(2) Home occupation $62.50 per year
(3) Mobile home $125
(4) Model home $500 per year
(5) Sexually oriented business $1,200/year
(6) Temporary use permit $75
(7) Wireless communication facility.
(a) New location $1,000
(b) Co-location $125
(8) Planning documents (e.g. comp plan) Cost of reproduction
(9) Large format printing $2/sq. ft.
(Ord. 2011-16, passed 9-8-11; Am. Ord. 2013-30, passed 10-24-13)