(A) Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by the building drain shall be lifted by an approved means and discharged to the building sewer.
(B) No person shall make connection of roof down spouts, exterior foundation drains, areaway drains or other sources of surface runoff or ground water to a building sewer or a building drain which in turn is connected directly or indirectly to a public sanitary sewer.
(C) The connection of the building sewer into the public sewer shall conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the Town or the procedures set forth in appropriate specifications of the A.S.T.M. and the W.P.C.F. Manual of Practice No. FD-5. All connections shall be made gas-tight and watertight. Any deviation from the prescribed procedures and materials must be approved by the Superintendent before installation.
(D) The applicant for the building sewer permit shall notify the inspector when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the inspector or his representatives.
(E) Within the municipal limits or within ten (10) miles of its corporate boundaries, the Town has the authority to require sewer connections to the Town's sewer system of any structures that discharge wastewater and that have an available sewer line within three hundred (300) feet of the property line (see also § 52.02(G)).
(`92 Code, § 9-31) (Ord. 85-22, passed 11-25-85; Am. Ord. 2011-06, passed 3-24-11; Am. Ord. 2013-21, passed 7-11-13) Penalty, see § 52.99