The subdivider shall be required to pay for all of the construction costs for the installation of utilities which are serving the proposed subdivision as determined by the Municipality and the Subdivider’s Estimates. The Municipality may elect to have the utilities over-sized to service the surrounding areas, providing the improvement is beneficial to the Municipality. The Municipality shall pay the difference between the cost of the requirements of the subdivision and required over- sizing improvements as follows:
(a) Water Mains: A subdivider shall install water mains according to the Municipality’s specifications. The material’s cost difference between the minimum required size of pipe and appurtenances, and over-sized pipe required by the Municipality, will be paid by the Municipality.
(b) Sanitary Sewers: A subdivider shall install sanitary sewers according to the Municipality’s specifications. The material’s cost difference between the minimum required size of pipe and appurtenances, and over-sized pipe required by the Municipality, will be paid by the Municipality. The construction cost difference as determined by the Municipal Manager for the minimum depth needed for installation, and the greater depth of installation required by the Municipality, will be paid by the Municipality.
(c) Storm Sewers: A subdivider shall install storm sewers according to the Municipality’s specifications. The material’s cost difference between the minimum required size of pipe and appurtenances, and over-sized pipe required by the Municipality, will be paid by the Municipality. The construction cost difference as determined by the Municipal Manager for the minimum depth needed for installation, and the greater depth of installation required by the Municipality, will be paid by the Municipality.
(d) Streets: The type and composition of street paving and surfacing shall be installed as per current Municipality specifications, or County Engineering specifications where applicable, and shall be commensurate with the volume, street classification, character and general circulation requirements, as determined by the Municipality. The cost of materials for the paved surface and its sub-base of an existing street, and any over-sizing cost in excess of the owner’s required responsibility needed to meet the dimensional standards for roadways, as shown on the Municipality of Brookville Comprehensive Development Plan, shall be at the Municipality’s expense. The costs for the minimum street width, as required by these Regulations, including curb, gutter, and sidewalks, shall be the developer’s responsibility and at his or her expense.