The subdivider shall be in default of the maintenance surety when the required public improvements have not been properly maintained over the 2-year period as established in Section 1181.01 Improvements and Performance Surety or when the required public improvements are not in accordance with the Record Drawings submitted by the subdivider to the Municipality. The same shall apply whenever construction of improvements is not performed in accordance with applicable standards and specifications. In such cases of default, the Municipality shall proceed to utilize the performance surety and/or maintenance surety to construct the required public improvements to the minimum design standards as required in these Regulations.