(a) Co-Location Design Required. No new tower shall be constructed in the City of Brookville, Ohio, unless such tower is capable of accommodating at least one additional wireless telecommunications facility owned by another person.
(b) Technically Suitable Space. Authorization for a tower shall be issued only if there is not technically suitable space reasonably available on an existing tower or structure within the geographic area to be served.
(c) Application Requirements. With the permit application, the applicant shall list the location of every tower, building or structure within a reasonable proximity that could support the proposed antenna. The applicant must demonstrate that a technically suitable location is not reasonably available on an existing tower, building or structure within such area. If another communication tower owned by another party within such area is technically suitable, the applicant must show that an offer was made to the owner of such tower to co-locate an antenna on a tower owned by the applicant on reciprocal terms within the City of Brookville, Ohio, and the offer was not accepted. If such co-location offer has not been attempted by the applicant, then such other tower is presumed to be reasonably available.
(Ord. 2014-07. Passed 9-16-14.)