§ 102.44 LOCATION AND RELOCATION OF FACILITIES.
   (A)   Placement, location, and relocation of facilities must comply with the Act, with other applicable law, and with Minn. Rules 7819.3100, 7819.5000 and 7819.5100, to the extent the rules do not limit authority otherwise available to cities.
      (1)   Relocation notification procedure. The Director shall notify the utility owner at least three months in advance of the need to relocate existing facilities so the owner can determine if relocation or replacement is required and plan any required work. The Director shall provide a second notification to the owner one month before the owner needs to begin the relocation. The utility owner shall begin relocation of the facilities within one month of the second notification. To the extent technically feasible, all utilities shall be relocated within one month or in a time frame determined by the Director. The Director may allow a different schedule if it does not interfere with the city's project. The utility owner shall diligently work to relocate the facilities within the above schedule.
      (2)   Delay to city project. The Director shall notify the utility owner if the owner's progress will not meet the relocation schedule. If the owner fails to meet the relocation schedule due to circumstances within the utility's control, the city may charge the utility owner for all costs incurred by the city because the relocation is not completed in the scheduled timeframe.
      (3)   Joint trenching. All facilities shall be placed in appropriate portions of right-of-way so as to cause minimum conflict with other underground facilities. When technically appropriate and no safety hazards are created, all utilities shall be installed, constructed or placed within the same trench. Notwithstanding the foregoing, gas and electric lines shall be placed in conformance with Minn. Rules 7819.5100, Subd. 2, governing safety standards.
   (B)   Corridors. The city may assign a specific area within the right-of-way, or any particular segment thereof as may be necessary, for each type of facilities that are or, pursuant to current technology, the city expects will be located within the right-of-way. All excavation, obstruction, or other permits issued by the city involving the installation or replacement of facilities shall designate the proper corridor for the facilities at issue. A typical crossing section of the location for utilities may be on file at the Director's office. This section is not intended to establish “high density corridors.” Any registrant who has facilities in the right- of-way in a position at variance with the corridors established by the city may remain at that location until the city requires facilities relocation to the corridor pursuant to relocation authority granted under Minn. Rules 7819.3100 or other applicable law.
   (C)   Limitation of space. To protect the public health, safety, and welfare or when necessary to protect the right-of-way and its current use, the city shall have the power to prohibit or limit the placement of new or additional facilities within the right-of-way. In making such decisions, the city shall strive to the extent possible to accommodate all existing and potential users of the right-of-way, but shall be guided primarily by considerations of the public interest, the public's needs for the particular utility service, the condition of the right-of-way, the time of year with respect to essential utilities, the protection of existing facilities in the right-of-way, and future city plans for public improvements and development projects which have been determined to be in the public interest.
   (D)   Service laterals. All permits issued for the installation or repair of service laterals, other than minor repairs as defined in Minn. Rules 7560.0150, Subp. 2, shall require the permittee's use of appropriate means of establishing the horizontal locations of installed service laterals and the service lateral vertical locations in those cases where the director reasonably requires it. Permittees or their subcontractors shall submit to the director evidence satisfactory to the director of the installed service lateral locations. Compliance with this subdivision and with applicable Gopher State One Call law and Minnesota Rules governing service laterals installed after December 31, 2005 shall be a condition of any city approval necessary for:
      (1)   Payments to contractors working on a public improvement project including those under M.S. Chapter 429; and
      (2)   City approval under development agreements or other subdivision or site plan approval under M.S. Chapter 462. The director shall reasonably determine the appropriate method of providing such information to the city. Failure to provide prompt and accurate information on the service laterals installed may result in the revocation of the permit issued for the work or future permits to the offending permittee or its subcontractors.
(Ord. 2003-1005, passed 10-20-03; Am. Ord. 2017-1225, passed 12-4-17)