§ 102.43 UNDERGROUNDING.
   (A)   Purpose. The purpose of this section is to promote the health, safety and general welfare of the public and is intended to foster (i) safe travel over the right-of-way, (ii) non-travel related safety around homes and buildings where overhead feeds are connected and (iii) orderly development in the city. Location and relocation, installation and reinstallation of facilities in the right-of-way or in or on other public ground must be made in accordance with this section. This section is intended to be enforced consistently with state and federal law regulating right-of-way users, specifically including but not limited to M.S. §§ 161.45, 237.162, 237.163, 300.03, 222.37, 238.084 and 216B.36 and the Telecommunications Act of 1996, 47 U.S.C. § 253.
   (B)   Undergrounding of facilities. Facilities newly installed, constructed or otherwise placed in the public right-of-way or in other public property held in common for public use must be located and maintained underground pursuant to the terms and conditions of this section and in accordance with applicable construction standards, subject to the exceptions below. Above-ground installation, construction, modification, or replacement of meters, gauges, transformers, street lighting, pad mount switches, capacitor banks, re-closers and service connection pedestals shall be allowed. The requirements of this section shall apply equally outside of the corporate limits of the city coincident with city jurisdiction of platting, subdivision regulation or comprehensive planning as may now or in the future be allowed by law.
   (C)   Undergrounding of permanent replacement, relocated or reconstructed facilities. If the city finds that one or more of the purposes set forth in division (A) would be promoted, the city may require a permanent replacement, relocation or reconstruction of a facility of more than 300 feet to be located, and maintained underground, with due regard for seasonal working conditions. For purposes of this section, reconstruction means any substantial repair of or any improvement to existing facilities. Undergrounding may be required whether a replacement, relocation or reconstruction is initiated by the right-of-way user owning or operating the facilities, or by the city in connection with (1) the present or future use by the city or other local government unit of the right-of-way or other public ground for a public project, (2) the public health or safety, or (3) the safety and convenience of travel over the right-of-way.
   (D)   Exceptions to undergrounding. The following exceptions to the strict application of this section shall be allowed upon the conditions stated:
      (1)   Transmission lines. Above-ground installation, construction, or placement of those facilities commonly referred to as “high voltage transmission lines” shall be allowed unless the Council requires undergrounding of the facilities after providing the right-of-way user notice and an opportunity to be heard. This provision shall not be construed as waiving the requirements of any other ordinance or regulation of the city as the same may apply to any such proposed project.
      (2)   Technical/economic feasibility; promotion of policy. Above-ground installation, construction, or placement of facilities shall be allowed in residential, commercial and industrial areas where the Council, following consideration and recommendation by the Planning Commission, finds that:
         (a)   Underground placement would place an undue financial burden upon the landowner, ratepayers, or right-of-way user or would deprive the landowner of the preservation and enjoyment of substantial property rights; or,
         (b)   Underground placement is impractical or not technically feasible due to topographical, subsoil or other existing conditions which adversely affect underground facilities placement; or
         (c)   The right-of-way user clearly and convincingly demonstrates that none of the purposes under division (A) would be advanced by underground placement of facilities on the project in question, or the city determines on its own review that undergrounding is not warranted based on the circumstances of the proposed undergrounding.
      (3)   Temporary service. Above-ground installation, construction, or placement of temporary service lines shall only be allowed:
         (a)   During new construction of any project for a period not to exceed 24 months;
         (b)   During an emergency in order to safeguard lives or property within the city;
         (c)   For a period of not more than seven months when soil conditions make excavation impractical.
   (E)   Developer responsibility. All owners, platters, or developers are responsible for complying with the requirements of this section, and prior to final approval of any plat or development plan, shall submit to the Director written instruments from the appropriate right-of-way users showing that all necessary arrangements with said users for installation of such facilities have been made.
(Ord. 2003-1005, passed 10-20-03; Am. Ord. 2017-1225, passed 12-4-17)