§ 1328.19 SIGN INSPECTIONS.
   (A)   Rough electrical;
   (B)   Final electrical; and
   (C)   Final general inspection within 60 days of permit issuance.
(Ord. 114-09, passed 10-5-2009; Ord. 15-15, passed 6-15-2015)