§ 52.067 ACCIDENTAL DISCHARGE/SLUG DISCHARGE CONTROL PLANS.
   (A)   The POTW manager shall evaluate whether each SIU needs an accidental discharge/slug discharge control plan or other action to control slug discharges. The POTW manager will evaluate an SIU for a slug discharge control plan within the first year of determining that an IU is an SIU. If POTW manager determines that the SIU does not require a slug control plan, then the SIU will be evaluated every two years thereafter, for the need to develop a slug discharge control plan. The POTW manager may require any User to develop, submit for approval and implement such a plan or take such other action that may be necessary to control slug discharges.
   (B)   An accidental discharge/slug discharge control plan shall address, at a minimum, the following:
      (1)   Description of discharge practices, including non-routine batch discharges;
      (2)   Description of stored chemicals;
      (3)   Procedures for immediately notifying the POTW manager of any accidental or slug discharge, as required by § 52.125 of this chapter; and
      (4)   Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to:
         (a)   Inspection and maintenance of storage areas;
         (b)   Handling and transfer of materials;
         (c)   Loading and unloading operations;
         (d)   Control of plant site runoff;
         (e)   Worker training;
         (f)   Building of containment structures or equipment;
         (g)   Measures for containing toxic organic pollutants, including solvents; and/or
         (h)   Measures and equipment for emergency response.
(Prior Code, § 22.03.030) (Ord. 22-17, passed 8-18-2022)