§ 156.588 APPLICATION REQUIREMENTS.
   Application submission for special use, variance and building permit requests may utilize any combination of site plans, surveys, maps, technical reports or written narratives necessary to convey the following information:
   (A)   A scaled site plan clearly indicating the location, type and height of the proposed tower, on-site land uses and zoning, adjacent land uses and zoning, adjacent roadways, proposed means of access, setbacks from property lines, elevation drawings of the proposed tower and any other proposed structures;
   (B)   A current map and aerial photograph showing the location of the proposed tower or small cell facility;
   (C)   Legal description of the parcel, if applicable;
   (D)   (1)   If not within the separation distance from residential areas, approximate distance between the proposed tower or small cell facility and the nearest residential unit, platted residentially zoned properties and un-platted residentially zoned properties.
      (2)   If, within the separation distance requirements, then exact distances, locations and identifications of said properties shall be shown on an updated city map;
   (E)   A landscape plan showing specific landscape materials;
   (F)   Method of fencing, and finished color and, if applicable, the method of camouflage and illumination;
   (G)   A notarized letter signed by the applicant stating the tower will comply with all EIA standards and all applicable federal and state laws and regulations and the city code, including, specifically, FAA regulations;
   (H)   A statement by the applicant as to whether construction of the tower will accommodate co-location of additional antenna for future users;
   (I)   Certification that the antenna usage will not interfere with other adjacent or neighboring transmission or reception functions;
   (J)   The telecommunications company must demonstrate that it is licensed by the FCC;
   (K)   The applicant, if not the telecommunications service provider, shall submit proof of lease agreements with an FCC licensed telecommunications provider;
   (L)   (1)   A full site plan shall be required for all cell sites, showing the antenna, antenna support structure, building, fencing, buffering, access and all other items required in this subchapter.
      (2)   The site plan shall not be required if the antenna or small cell facility is to be mounted on an existing structure, including city-owned power and light poles;
   (M)   At the time of site selection, the applicant should demonstrate how the proposed site fits into its overall network within the city;
   (N)   This subchapter shall apply to all applications which were filed prior to the effective date hereof and which have not been approved by the City Council as of the effective date of this subchapter, and to applications filed thereafter; and
   (O)   (1)   At the wireless service provider’s discretion, a consolidated application for a small cell network, or portion of a small cell network, may be submitted for the city’s permitted use/site plan review process as an alternative to individual permitting for each small cell facility in a small cell network.
      (2)   The consolidated application shall be reviewed in a single permitted use/site plan review process that includes review of all required land use permits for all sites within the proposed small cell network.
(Prior Code, § 29.32.130) (Ord. 14-14, passed 11-6-2014)