(A) (1) For individual subdivisions and development proposals, the developer shall submit a site plan prepared by a professional engineer showing the property boundary with topography, proposed building envelopes and proposed public and private roads and streets. The submittal shall show infrastructure necessary to serve the proposed development with a sanitary sewer system serving all building lots. A sanitary sewer system is necessary for the following purposes:
(a) To protect existing and future city water sources from contamination;
(b) To provide development sites with an efficient and reliable system for the treatment of sewage and waste water; and
(c) To protect water bodies on and adjacent to the property subject to this planned district from contamination.
(2) The system shall be designed in compliance with the Brigham City Public Works Standards and Technical Specifications, or applicable modifications thereto.
(B) Easements or rights-of-way required for sewer service by the city’s Waste Treatment Department shall be provided by all developments proposing public sewer systems prior to final subdivision plat or final development plan approval.
(C) Where the city sanitary sewer capital facilities plan calls for sewer main sizes through a development that are larger than necessary to serve the development, the larger main shall be installed in accordance with city policy.
(Prior Code, § 29.22.050)