The construction of new critical facilities shall be, to the extent possible, located outside the limits of the SFHA. The construction of new critical facilities shall be permissible within the SFHA if no feasible alternative site is available. Critical facilities constructed within the SFHA shall have the lowest floor elevated to or above the FPG at the site. Flood-proofing and sealing measures must be taken to ensure that toxic substances will not be displaced by or released into floodwaters. Access routes elevated to or above the FRG shall be provided to all critical facilities to the extent possible.
(Ord. 4-2011, passed 9-12-2011) Penalty, see § 154.99