§ 8.42.350 WORK AND RESTORATION OF STREETS.
   A.   The work of constructing, laying, replacing, maintaining, repairing or removing all pipelines and other facilities authorized under the provisions of this chapter in, over, under, along or across any street shall be conducted to minimize hindrance to the use of the street for purposes of travel, and as soon as such work is completed, all portions of the street which have been excavated or otherwise damaged thereby shall promptly and in a workerlike manner be repaired, replaced or restored and placed in as good condition as the same as before the commencement of such work. For streets that have been rehabilitated within five (5) years prior to the work the city shall require the resurfacing, or other treatment, of the entire width of the street or streets as directed by the City Engineer. For those streets that have not been rehabilitated by the city within five (5) years prior to the work the restoration shall be in full compliance with the City of Brea excavation requirements. All restoration, repair, or replacement work shall be done to the satisfaction of the Public Works Department at the expense of the franchisee in accordance with all applicable law.
   B.   In the event that the franchisee shall fail or neglect to make such highway repair, replacement, or restoration work, then ten (10) days after notice therefor has been given franchisee by the City Engineer, the city may repair, replace or restore the highway at the expense of franchisee. The franchisee shall pay to the city the cost of performing such work. The amount so chargeable shall be the direct cost of such work plus the current rate of overhead being charged by the city for reimbursable work.
(Ord. 1152, passed 5-17-11)