CHAPTER 51:  DRAINAGE AND SEDIMENT CONTROL STANDARDS
Section
General Regulations
   51.01   Preamble
   51.02   Conflicting ordinances
   51.03   Compliance with this chapter and other ordinances
   51.04   Abbreviations and definitions
   51.05   General stormwater control policy
   51.06   Determination of impact drainage areas
   51.07   Information requirements
   51.08   Submittal and consideration; roles of city engineer and Council
   51.09   Methodology for determination of pre and post-development runoff quantities
   51.10   Methodology for determination of detention storage volumes
   51.11   Storm sewer design standards and specifications
   51.12   Open channel design standards and materials
   51.13   Stormwater detention design standards
   51.14   Miscellaneous design criteria
   51.15   Easement requirements
Specific Regulations
   51.30   Erosion and sediment control
   51.31   Placement of utilities
   51.32   Compliance required and time limits for permits
   51.33   Change in plans
   51.34   Certifications required for as-built condition
   51.35   Subdivision covenants
   51.36   Inspections and corrective measures
   51.37   Disclaimer of liability
   51.38   Effective date
   51.39   Exempt projects
   51.40   Permit fees
   51.41   Detailed drawings of design standards and appendix incorporated by reference
   51.99   Penalty