Section
General Regulations
51.01 Preamble
51.02 Conflicting ordinances
51.03 Compliance with this chapter and other ordinances
51.04 Abbreviations and definitions
51.05 General stormwater control policy
51.06 Determination of impact drainage areas
51.07 Information requirements
51.08 Submittal and consideration; roles of city engineer and Council
51.09 Methodology for determination of pre and post-development runoff quantities
51.10 Methodology for determination of detention storage volumes
51.11 Storm sewer design standards and specifications
51.12 Open channel design standards and materials
51.13 Stormwater detention design standards
51.14 Miscellaneous design criteria
51.15 Easement requirements
Specific Regulations
51.30 Erosion and sediment control
51.31 Placement of utilities
51.32 Compliance required and time limits for permits
51.33 Change in plans
51.34 Certifications required for as-built condition
51.35 Subdivision covenants
51.36 Inspections and corrective measures
51.37 Disclaimer of liability
51.38 Effective date
51.39 Exempt projects
51.40 Permit fees
51.41 Detailed drawings of design standards and appendix incorporated by reference
51.99 Penalty