(A) Fences may be located within a required structure setback area provided they are designed, constructed, and maintained so as to not obstruct the flow of storm water.
(B) Water quality ponds may encroach into required wetland buffer strip areas, provided that the amount of buffer strip encroached upon does not exceed 50% of the total area required for such ponding, and provided that the amount of buffer strip encroached upon does not exceed 50% of the total area required for buffering. These limitations may be exceeded where two-cell water quality ponding is provided.
(Ord. 290, passed 7-7-2020)