(A) Plans for surface water runoff and drainage shall be reviewed by the Planning Commission and City Council prior to final plat approval.
(B) The subdivision should be so designed that the drainage system utilizes, to the greatest extent possible, existing natural overland flows, open channel, and drainage routes.
(C) The drainage system shall be constructed and operational during the initial phase of construction.
(Ord. 199, passed 2-7-2000)