(A) The contractor shall furnish line and grade stakes as required by the City Engineer for proper control of the work. The contractor shall preserve the stakes set for line and grade until the sidewalk has been poured and finished. The contractor shall call the Engineering Department to inspect the forms for proper line and grade prior to pouring a sidewalk. A minimum of 24 hours notice shall be provided.
(B) The Public Works Director may not authorize sidewalk work on lots where a house is proposed until after the foundation of the house is finished and all utility construction is complete.
(Ord. 8349, passed 9-2-2014; Am. Ord. 9133, passed 10-2-2023)