(A) All water service lines which are installed, repaired or replaced within the village shall be polyethylene (PE) plastic tubing for water service lines only meeting the requirements of American Society for Testing Materials (ASTM) D2737-83.
(B) Prior to covering or closing the water service line installation, repair or replacement, the owner, agent of the owner, or contractor performing the work, shall contact the Village Administrator to arrange for an inspection of the water service line. The water service line shall not be covered or closed unless and until the water service line is inspected and approved by a representative of the village.
(Ord. 87-15, passed 11-10-1987)