§ 34.26 COUNTY SURVEYOR FEE.
   The fee schedule for application and inspection fees for the office of County Surveyor are as follows:
Subdivision
Minor subdivision
   Primary and secondary
$250
Major subdivision
   Primary
$500 + $15 per lot
   Secondary
$500 + $10 per lot
Revision – (change to an approved plat not recorded)
$250
Amendment – (change to recorded plat)
$250
Re-plat – (vacation of a recorded plat)
$250
Shopping Center
Preliminary Development Plan
$1000 + $15/lot
Final Development Plan
$1000 + $10/acre
Amendment to approved Final Development Plan
$1000 + $10/acre
Planned Unit Development
Preliminary Development Plan
$500 + $15/lot
Final Development Plan
$500 + $10/lot
Amendment to an approved Planned Unit Development
$500 + $10/lot
Development Plan Review
Preliminary Development Plan
$500 + $15/lot
Final Development Plan
$500 + $10/acre
Amendment to Development Plan
$500 + $10/acre
Commercial/Industrial
Application and review
$1,000 + $10/acre
Individual Residence
Regulated drain outlet
$100/outlet
Regulated drain crossing permit
$150/crossing
Regulated drain encroachment permit
$150/encroachment
(Note: All fees in this section of the table can be waived or modified by the County Surveyor and/or the County Drainage Board)
Utilities
Regulated drain crossing permit
$250/crossing
Regulated drain encroachment permit
$.25/foot (minimum $250)
(Note: All fees in this section of the table can be waived or modified by the County Surveyor and/or the County Drainage Board. All fees will be waived if the permit is for work within a new subdivision. A new subdivision refers to a development granted final approval by the County Area Plan Commission within the last 24 months.)
Other
Removal of obstruction application
$25
Variance of regulated drainage easement
$150
(Note: All fees in this section of the table can be waived or modified by the County Surveyor and/or the County Drainage Board.)
Engineering Review Fees
All engineering projects will require a review fee above and beyond the application fees. The review fee shall equate to the contract rate of the reviewing engineer, not to exceed $110/hour. This fee shall be paid to the office of the County Surveyor and shall be paid in full before any project approval is given.
Residential
Single-family dwelling
$200
Two-family dwelling
$250
Additions
$50
Accessory structures
$50
Detached garage
$50
Swimming pools
$50
Relocation
$50
Stop Work Orders
Permit re-instatement fee
Minimum $500 or two times the filing fee, whichever is greater
Continued construction after stop work order
$1,000 first day and up to $500 for each additional day
Miscellaneous Fees
Copy of County Drainage Ordinance
$25
Mylar aerial
$1
GIS aerial
$2
Blueprint copies – 24" x 36" and less
$1.50
Blueprint copies – 36" x 48" and larger
$3
Returned check fee
$30
All fees are non-refundable (unless so permitted by the County Drainage Board)
 
(Ord. 2005-02, passed 2-14-2005)