(A) The schedule of fees for the issuance of commercial/industrial building permits shall be based upon the formulas and building valuation data report set out in Exhibit A of Ordinance 930.9 and hereby adopted by reference as if set out herein.
(B) The schedule of fees for the issuance of residential building permits is hereby established and adopted as follows:
Residential Building Permit Fees | |
Estimated Construction Costs | Permit and Inspection Fee |
$0 - $999.99 | $20 |
$1,000 - $4,999.99 | $30 |
$5,000 - $9,999.99 | $40 |
$10,000 - $14,999.99 | $60 |
$15,000 - $29,999.99 | $85 |
Residential Building Permit Fees | |
Estimated Construction Costs | Permit and Inspection Fee |
Residential Building Permit Fees | |
Estimated Construction Costs | Permit and Inspection Fee |
$30,000 - $49,999.99 | $150 |
$50,000 - $74,999.99 | $200 |
$75,000 - $99,999.99 | $250 |
$100,000 - $149,999.99 | $300 |
$150,000 - $199,999.99 | $400 |
$200,000 - $249,999.99 | $500 |
$250,000 - $349,999.99 | $600 |
$350,000 - $499,999.99 | $800 |
$500,000 - $749,999.99 | $1,000 |
$750,000 - $999,999.99 | $1,500 |
$1,000,000 - $1,999,999.99 | $2,500 |
$2,000,000 - $2,999,999.99 | $3,500 |
$3,000,000 - $3,999,999.99 | $4,500 |
$4,000,000 - $4,999,999.99 | $5,500 |
$5,000,000 - $5,999,999.99 | $6,500 |
$6,000,000 and up | $6,500 plus $1,000 per each additional $1,000,000 of construction cost |
(C) The following formula will be utilized in establishing estimated construction costs for residential constructions:
Living space | $45 per sq. ft. | |
Basements (unfinished) | $12 per sq. ft. | |
Garages (attached) | $10 per sq. ft. | |
Garages (detached) | $15 per sq. ft. | |
Finished basements | $22 per sq. ft. | |
Sidewalk/apron inspection fee | $30 | |
Deck/storage sheds | $30 up to 200 sq. ft. | $5 for each addtl. 100 sq. ft. or fraction thereof |
Above ground pools | $20 | |
Inground pools | $100 | |
Pole barns | $40 up to 1,000 sq. ft. | $5 for each addtl. 500 sq. ft. or fraction thereof |
Demolition | $75 | |
Plan revision fee | $50 | |
Re-inspection fee | $50 | Paid prior to reinspection |
Alteration/repair fee | $20 per sq. ft. | Minimum $50 fee |
Construction start without a permit | Double fee | |
(D) If the cost of construction submitted by the applicant on the permit application is calculated differently than this fee schedule, fees will be based on documents submitted.
(E) HVAC permit fees. The imposition and collection of HVAC permit fees shall be consistent with the fee schedule in effect by the state under 815 KAR 8:070.
(Ord. 930.8A, passed 3-23-93; Am. Ord. 930.9, passed 3-23-93; Am. Ord. 04-04, passed 3-16-04; Am. Ord. 13-07, passed 3-12-13)