§ 50.220 GENERAL.
   (A)   The developer shall furnish and install two submersible non-clog sewage pumps to deliver adequate GPM against a total head to be determined by an engineering firm.
   (B)   The pump discharge size shall be four inches.
(Ord. passed 6-21-2011)