12-482: MINING:
   A.   A reclamation plan approval by the Idaho department of lands shall be applied for, and a copy of the application shall accompany the application for the conditional use permit. Temporary and permanent landscaping and safety fencing shall be provided around all excavations in urban areas. A site plan for the entire parcel shall be submitted with the application identifying the location of any pits, stockpiles, hauling roads, processing facilities, equipment or material storage, fencing, screening and any other pertinent features. A reclamation plan shall also be submitted showing the condition and topography of the land after material and structures have been removed. A grading/stormwater management plan shall be prepared and submitted concurrently with the application for conditional use permit pursuant to the requirements of subchapter 7.2 of this title.
   B.   The mined area shall not be located closer to the nearest property line or public right of way than a horizontal distance equal to one and one-half (11/2) times the vertical depth of the mined area at any given point, except that steeper slopes may be permitted where certified by an Idaho licensed engineer. In no instance shall the actual mined area extend to within sixty feet (60') of the nearest property line or public right of way. Drainage from areas disturbed by surface mining shall be filtered, treated and contained on site.
   C.   The landowner (applicant) shall apply dust abatement (magnesium chloride or other suppressants acceptable to Bonner County) to the private, nonpaved easement and the haulage road on a yearly and/or as needed basis, at no cost to Bonner County.
   D.   No debris from the mining operation shall be placed or tracked onto the public rights of way by vehicles used for the operation, to the satisfaction of the transportation agency having jurisdiction over the adjacent roadways.
   E.   Fugitive dust shall be controlled by the applicant at all times to the satisfaction of the Idaho department of environmental quality and consistent with the approved fugitive dust control plan.
   F.   The applicant shall comply with all requirements of the reclamation plan approved by the Idaho department of lands.
   G.   All retail sales of materials on the site are prohibited.
   H.   The signs on the site shall comply with the standards of subchapter 4.4 of this title.
   I.   The applicant shall install and maintain hazard fencing and signing to warn of the mining danger, to the satisfaction of the Bonner County Planning Department.
   J.   The applicant shall maintain or restore vegetative buffering of the site, where feasible. (Ord. 501, 11-18-2008)